My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS <br />McGRANAHAN ARCHITECTS <br />Section 0130 00, Page 1 <br />ADMINISTRATIVE REQUIREMENTS <br />ADMINISTRATIVE REQUIREMENTS <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. Modification procedures. <br />B. Submittals for review, information, and project closeout. <br />C. Number of copies of submittals. <br />D. Submittal procedures. <br />E. General coordination, including coordination drawings. <br />1.02 RELATED SECTIONS <br />A. Division 0 - General Conditions <br />B. Division 1 — Summary of Work <br />C. Division 1 - Construction Progress Schedule <br />D. Division 1 - Execution Requirements: Additional coordination requirements. <br />E. Division 1 - Closeout Submittals: Project record documents. <br />1.03 MODIFICATION PROCEDURES <br />A. General: <br />1. Changes to and / or clarifications of the work may be made by response to a request for information, order <br />for a minor change in the work, Construction change directive, and Change Orders. <br />2. A monetary change to the Contract is only implemented by a Change Order. <br />B. Request for Information (RFI): <br />1. Procedure: <br />a. Form is automatically generated by Newforma InfoExchange. <br />b. Prepared by Contractor. <br />C. Transmitted to Architect by Newforma InfoExchange. <br />d. Response by Architect. <br />e. Acceptance by Owner. <br />f. Transmitted by Architect to Contractor by Newforma InfoExchange. <br />g. Contractor must either: <br />1) Proceed upon receipt of response if no Cost/Time impact; or <br />2) Submit a notice of cost and/or time impact within 5 days of the date that a response was first <br />issued to the contractor. <br />3) Submit substantiation to any claim, including the requested compensation, within 30 days from <br />the date that gave rise to the notice of claim. <br />4) By proceeding without submitting a statement of impact the Contractor agrees that there is no <br />impact on the Contract Cost or Time. <br />h. RFIs and responses shall be numbered consecutively by the contractor and submitted electronically. <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.