Laserfiche WebLink
Sno-Isle TECH 2O23 Small Works <br />2120.000 <br />CHANGE ORDER PROPOSAL: 001 <br />PROPOSED CONTRACT MODIFICATION: <br />Please submit an itemized proposal for changes in the Contract Time and Contract Sum for the following proposed <br />modifications to the Contract Documents (This document is not a Change Order, Field Authorization or direction to <br />proceed with the work described herein): <br />1. Description of item to be changed. <br />2. <br />Reference: <br />Attachments: <br />PROPOSED CONTRACT ADJUSTMENTS: <br />The proposed change to the Contract Sum or Guaranteed Maximum Price for all work described above is: <br />❑ (increase) (decrease) of : $ (Washington State Sales Tax not included) or, <br />❑ The Contract Sum shall remain unchanged. <br />The proposed change to the Contract Time for all work described above is: <br />❑ (increase) (decrease) of days or; <br />❑ The Contract Time will remain unchanged. <br />The foregoing amount includes all direct and indirect costs for material, labor and supplies related to this change and to the <br />effect of this change on the remainder of the Project. All other provisions of the Contract remain in full force and effect. <br />The Contractor agrees to be bound by this proposal for ninety (90) days after this date. <br />Submitted by: Date: <br />General Contractor <br />We have examined the foregoing proposal, negotiated with the Contractor where necessary, and find it to be reasonable <br />Approved By: Date: <br />McGranahan Architects <br />The Owner hereby accepts the foregoing proposal. This document when fully signed constitutes the conditions upon which <br />a Change Order will be issued. <br />Accepted By: <br />Owner <br />Date: <br />McGRANAHAN""it" 1 1 <br />