My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sno-Isle TECH 2O23 Small Works <br />2120.000 <br />CONSTRUCTION CHANGE DIRECTIVE: OOX <br />CONTRACT MODIFICATION: <br />In order to expedite the Work and avoid delays, the Contractor is hereby directed to make the following change(s) in this <br />Contract: <br />1. Description of Item to be changed. <br />2 <br />Reference: <br />Attachments: <br />PROPOSED CONTRACT ADJUSTMENTS: <br />The Contract Sum or Guaranteed Maximum Price will be adjusted on following basis: <br />❑ Lump Sum (increase) (decrease) of: <br />❑ As provided in Article 7 of the General Conditions or, <br />❑ As follows: Time and Materials: <br />The Contract Time will: <br />❑ Remain unchanged; <br />❑ (increase) (decrease) by days or; <br />❑ be adjusted as provided in Article 8 of the General Conditions. <br />When issued by the Architect and approved by the Owner, this document shall serve as authorization to proceed with the <br />Work as described above. The Contractor shall proceed IMMEDIATELY. When the actual adjustments to the Contract Sum <br />and/or Contract Time are agreed to by the Architect, Owner and Contractor, this Work shall be added to the Contract by <br />Change Order. <br />Issued By: Date: <br />McGranahan Architects <br />Approved By: <br />Date: <br />Owner <br />Signature below indicates the Contractor's acknowledgement of the direction to proceed with the Work immediately. <br />The Contractor O(agrees) O(disagrees) with the proposed method of adjustment in the Contract Sum and Contract Time. <br />Accepted By: Date: <br />Contractor <br />McGRANAHAN architects <br />
The URL can be used to link to this page
Your browser does not support the video tag.