My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS <br />McGRANAHAN ARCHITECTS <br />Section 0150 00, Page 1 <br />TEMPORARY FACILITIES AND CONTROLS <br />TEMPORARY FACILITIES AND CONTROLS <br />PART 1 GENERAL <br />1.01 SECTION INCLUDES <br />A. Temporary Utilities. <br />B. Temporary telephone and e-mail service. <br />C. Temporary sanitary facilities. <br />D. Drinking Water <br />E. Storage <br />F. Temporary Controls: Barriers, enclosures, and fencing. <br />G. Demolition and Construction Waste Management. <br />H. Project identification signs. <br />I. Indirect equipment. <br />J. Field office. <br />K. Field staffing. <br />L. Home office expenses. <br />1.02 TEMPORARY UTILITIES <br />A. Provide means, methods, material, and labor necessary to provide all lighting, heating, and cooling, and <br />ventilation required for construction purposes. <br />1. Furnish, by methods approved by State WISHA requirements, temporary heat including fuel and power <br />and attendance as required to protect materials and work from dampness and cold and to dry out the <br />building. Include all costs for temporary heat in bid items. See Technical Sections for temperatures <br />required for work of the various trades. <br />a. Provide temporary heat required by construction activities for curing or drying of completed <br />installations or for the protection of installed construction from adverse effects of low temperatures or <br />high humidity or as specified. Select safe equipment that will not have a harmful effect on completed <br />installations or elements being installed. Coordinate ventilation requirements to produce ambient <br />condition required and to minimize energy consumption. <br />b. Except when the Contractor is authorized to use the new permanent system, provide vented, self- <br />contained, LP -gas, electric, or fuel -oil heaters with individual space thermostatic control. <br />C. Use of gasoline -burning space heaters or open flame units is prohibited. <br />2. Provide all temporary lighting as required for the work. Provide wiring for all required extension cords, <br />lighting outlets, and power outlets (grounding type), lamps, and other required equipment and <br />accessories. Remove temporary lighting connections at completion of the work, or sooner, if approved or <br />directed. <br />mcg-ARC 2120.000 <br />February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.