My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD BLDG 4 2025-10-27
>
Address Records
>
AIRPORT RD
>
9001
>
9001 AIRPORT RD BLDG 4 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:45:58 AM
Creation date
10/10/2025 11:53:18 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Unit
BLDG 4
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
396
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SNO-ISLE TECH 2O23 SMALL WORKS Section 0150 00, Page 4 <br />McGRANAHAN ARCHITECTS TEMPORARY FACILITIES AND CONTROLS <br />' r <br />1.10 INDIRECT EQUIPMENT <br />A. Provide indirect equipment as required for proper execution of the work, including but not limited to: <br />1. Compressors <br />2. Forklifts <br />3. Generators <br />4. Equipment operation ; <br />5. Other construction equipment and rental costs <br />6. Portable radios <br />7. Copier <br />8. Computer <br />9. Scanner <br />I <br />10. Digital camera - <br />11. Video camera <br />12. Saw sharpening <br />13. Small tools <br />14. Temporary stairs & ladders <br />1.11 FIELD OFFICE <br />A. Use of existing building for the Project Field Office is allowed for this project, furnished as follows: <br />1. Coordinate space for Project meetings with the Owner, with table and chairs to accommodate a minimum <br />of 6 people. <br />2. Equip as necessary to provide for efficient execution of the work including sufficient office space for <br />Contractor's field staff. <br />3. Maintain in field office a digital camera, including download interface to project computer. <br />B. Remove office and equipment and all temporary utilities from the site when notified by the Owner J <br />Representative. <br />1.12 MISCELLANEOUS TEMPORARY REQUIREMENTS ! <br />A. Hoisting Equipment: <br />1. Provide and maintain of type at Contractor's option, for hoisting of materials for the new work. Separate <br />contractors and subcontractors shall make arrangements with and pay for use of hoisting equipment at <br />rates not exceeding the standard for the construction industry in the area for hoisting time. Should any <br />products of any subcontractor require greater hoisting capacity than that provided by the General <br />Contractor, subcontractor shall provide same at his expense. <br />4 <br />I <br />mcg-ARC 2120.000 February 28, 2023 <br />
The URL can be used to link to this page
Your browser does not support the video tag.