Laserfiche WebLink
1/31/25,8:02 AM Mail-Scott Schreffler-Outlook <br /> Outlook <br /> Re: B2410-052 - 2520 100th SE Building Permit <br /> From Scott Schreffler <SSchreffler@everettwa.gov> <br /> Date Fri 1/31/2025 8:02 AM <br /> To ssttl205@hotmail.com <ssttl205@hotmail.com> <br /> Hello Brandon, <br /> I reviewed your resubmittal and the following comments from my previous email below have not been <br /> addressed. See below in red. <br /> Please revise the plans and resubmit according to the online protocol at the following link. <br /> https://www.everettwa.gov/DocumentCenter/View/35938 <br /> Regards, <br /> —Scott Schreffler, Registered Architect <br /> `-Senior Building Plans Examiner I Permit Services <br /> 425.257.8810 13200 Cedar Street, 2nd Floor, Everett, WA 98201 <br /> EVERETTPhone Hours: M-F: 8:30 a.m. — 12 p.m & 1 p.m. — 3 p.m. <br /> everettwa.Qov permits I Facebook I Twitter <br /> Note: Emails and attachments sent to and from the City of Everett are public records and may be subject to disclosure pursuant <br /> to the Public Records Act. <br /> From: Scott Schreffler <br /> Sent: Wednesday, December 11, 2024 2:35 PM <br /> To: ssttl205@hotmail.com <ssttl205@hotmail.com> <br /> Subject: B2410-052 -2520 100th SE Building Permit <br /> Hello Brandon, <br /> I reviewed the drawings and revisions are required to continue my review. See comments as follows: <br /> 1. It appears you reused the drawings from the previous permit. The work that is referred to on the previous <br /> permit has been completed. For example, graphics and notes indicate "NEW WALLS" These are in fact <br /> now existing. OK. <br /> 2. Submittal requirements include providing an existing floor plan, and a proposed floor plan. Please revise <br /> your proposal to accurately reflect what is new vs.what is existing. All work is considered new unless <br /> annotated as existing. Please clarify. OK <br /> 3. Please provide a new "PROPOSED"floor plan that includes all the IRC Section 330 requirements. These <br /> must be shown on the plans. Reference to other drawings is acceptable, as annotated on the floor plan.OK <br /> 4.The proposed work includes a new ramp at the front of the house. The ramp is shown differently on the <br /> site plan vs. floor plan. I presume this is a new ramp as it does not appear on the previous permit, nor in <br /> any photographs of the existing house. This ramp requires construction details, dimensions, handrail and <br /> guard requirements per IRC 330.9. Please provide all the details of construction complying with the <br /> https://outlook.office.com/mail/sentitems/id/AAQkADNhZWMzOT15LTJINzMtND12Zil iZjNhLWVINzg1 OTMxMGJiMAAQAAgNlsXKrOnSrC8yASCd2h4%... 1/2 <br />