My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1903 JACKSON AVE A, B 2023 Plans 2025-10-13
>
Address Records
>
JACKSON AVE
>
1903
>
Plans
>
1903 JACKSON AVE A, B 2023 Plans 2025-10-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 1:21:27 PM
Creation date
10/13/2025 1:20:17 PM
Metadata
Fields
Template:
Address Document
Street Name
JACKSON AVE
Street Number
1903
Unit
A, B
Permit
B2311-025
Year
2023
Notes
NEW DUPLEX AFTER DEMO OF EXISTING SFR
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
° <br />42 DIA. II <br />2'-0" MIN. d it <br />II <br />?I� <br />� 1 <br />II <br />a d . ° ;. <br />g--- = 8 - _�_— ==-4_= <br />°. d. d 1 <br />42 DIA. <br />2'-0" MIN. <br />CORNER BAR SAME SIZE & <br />SPACING AS HORIZ. WALL REINF. <br />z-�---a <br />42 DIA. 42 DIA. <br />0" M 2'—IN. 2'-0" MIN. <br />ALTERNATE BAR <br />DIRECTION <br />II <br />I <br />dI <br />II <br />I� <br />I <br />42 DIA. <br />2'-0" MIN <br />CORNER REINFORCEMENT DETAILS <br />30" MI <br />REBAR <br />LENGTI- <br />CLEAR SPAN <br />17 MAXIMUM <br />ONE #4 REBAR <br />IN SHEAR CONE <br />(12" MIN. REBAR <br />LENGTH) <br />FROM CORNER <br />R M JO ST 'STH D' INSTALLATION <br />WITHOUT RIMJOIST SIMILAR <br />BEAM PER PLAN <br />SIMPSON "AC" CAP EA SOLID BLOCKING IN EACH <br />SIDE OR 12"x12" PLYWOOD JOIST BAY <br />GUSSET W/ (6) 16d NAILS POST PER PLAN <br />EA. MEMBER OR PER PLAN <br />SIMPSON AB POST <br />STRIP FOOTING PER BASE OR EQUIVALENT <br />PLAN REINFORCEMENT <br />PER SCHEDULE <br />SURE TREATED POST <br />PLAN <br />�APSON AB POST BASE OR <br />)UIVALENT <br />0 CONCRETE COLUMN w/ (4) <br />BARS EQUALLY SPACED & #3 <br />® 6" o.c. HOOK VERTS TO <br />TING AS SHOWN. <br />FOOTING PER PLAN <br />POST TO FOOTING <br />SOLATED POST BASE <br />CONNECTION <br />ELEVATION VIEW <br />'H DU (FVG)' <br />RIM JOIST PEF <br />1Y4" MIN <br />POST PER PLAN/ <br />SCHEDULE (2-2x MIN) <br />HOLDOWN PER PLAN <br />ALL —THREAD ROD, <br />DIAMETER AND <br />EMBEDMENT PER <br />SCHEDULE <br />PRESSURE TREATED <br />SILL PLATE PER <br />SHEARWALL SCHEDULE <br />STEM WALL PER <br />FOUNDATION SCHEDULE <br />FOOTING PER PLAN <br />N STALLAT ON <br />2x HF#2 LEDGER PER PLAN <br />(DEPTH TO MATCH JOISTS) <br />(2) SDWS22400 SCREWS AT <br />SPACING SHOWN <br />6"--- <br />JOIST AND <br />HANGER PER <br />PLAN <br />Q <br />CENTER FOOTING ON <br />WALL, VERIFY <br />MINIMUM DISTANCES <br />FOR HOLDOWN ARE <br />MET. <br />-F <br />2F <br />SECTION VIEW <br />N <br />FASTENER SPACING <br />30" mir <br />REBAR <br />LENGTH <br />ONE #4 REBAR <br />IN SHEAR CONE <br />(12" MIN. REBAR <br />LENGTH) <br />FROM rCORNER <br />'STH D' INSTALLATION <br />WALL PER PLAN <br />SILL PLATE AND ANCHOR <br />BOLTS PER SHEARWALL <br />SCHEDULE. (USE 2x6 P.T. <br />SILL PLATE W/ 5/8" 0 <br />J—BOLTS @ 48" O/C MIN.) <br />SHEARWALL EDGE NAILING <br />INTO SILL PLATE <br />6" <br />(2) LAYERS OF 90# <br />FELT OR EQUIVALENT <br />fv <br />` SLAB PER PLAN <br />d d <br />�. I •. . <br />Id �8" WALL w/ #4 <br />I e BARS @ 18" o/c <br />EACH WAY. (2) #4 <br />BARS ® TOP. HOOK <br />VERTICAL BARS INTO <br />FOOTING — <br />4, ALTERNATE HOOK <br />DIRECTION. <br />4" 0 PERFORATED PLASTIC PIPE J F--16" (2) # 4 (TYP) <br />CENTER IN ONE CUBIC FOOT OF <br />FREE DRAINING GRAVEL AND <br />DRAIN TO APPROVED OUTFALL. <br />)FNDN�SHEARWALL �CONN. <br />WEB STIFFENER - <br />INSTALLED SNUG <br />FOR I —JOISTS. NO <br />STIFFENERS REQ'D <br />FOR SOLID SAWN. <br />PLACE 2x6 SQUASH <br />BLOCK EA SIDE OF <br />JOIST. WHERE HD <br />DOES NOT LINE UP <br />OVER JOIST, USE <br />SQUASH BLOCK <br />EQUAL TO WIDTH <br />OF HD POST <br />ABOVE (4x MIN). <br />EMBEDMENT <br />LENGTH <br />BACKFILL / POROUSJ <br />MAT RIAL (TYP) <br />FROST DEPTH , <br />(18" MIN) 8, , 1, 5; <br />Q d <br />d d <br />° <br />d <br />_4' <br />° <br />d . <br />° <br />�. d °. <br />e d '4 <br />I <br />e ° ' <br />d <br />d °. <br />POST PER PLAN/HOLDOWN <br />SCHEDULE (2-2x MIN) <br />HOLDOWN PER PLAN <br />(HDQ8 SHOWN) <br />ANCHOR BOLT PER <br />HOLDOWN SCHEDULE w/ <br />CNW COUPLER NUT AS <br />REQ'D <br />BOTTOM PLATE PER <br />SHEARWALL SCHEDULE <br />RIM JOIST PER PLAN. <br />1Y2" MIN WIDTH AT <br />SHEARWALLS. <br />PRESSURE TREATED <br />SILL PLATE PER <br />SHEARWALL SCHEDULE. <br />STEM WALL AND FOOTING <br />PER PLAN. (FOR HDU11, <br />HDU14, AND HD19 <br />CONNECTIONS REFERENCE <br />THE HOLDOWN SCHEDULE <br />FOR FOOTING <br />REQUIREMENTS) <br />U <br />Q) <br />(f) <br />> O N <br />O <br />Q) <br />QNO <br />U <br />(�00 <br />n4- <br />_ <br />w Q Pr)Q) <br />U <br />U <br />v�N <br />> <br />0 <br />^� <br />a <br />U <br />0" <br />O > O <br />rqw= <br />3: <br />3: <br />n <br />z o <br />0 w <br />Cn 0 <br />w <br />J <br />2' <br />0 <br />m ff) <br />N <br />w Co <br />I— o <br />Q o <br />0 <br />0 <br />Z o <br />FEB 19, 2024 <br />Drawn By: CHRIS L. <br />Checked By: CHRIS <br />Date: 02-15-2024 <br />SDA JOB NO. <br />9902 <br />FRAMING TO STRIP FOOTING <br />CON N . <br />LEDGER CONNECTION @ <br />FOUNDATION <br />HOLDOWN w/ RIM CONNECTION <br />W/O RIM CONNECTION SIMILAR <br />STRUCTURAL <br />DETAILS <br />S-4.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.