My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1903 JACKSON AVE A, B 2023 Plans 2025-10-13
>
Address Records
>
JACKSON AVE
>
1903
>
Plans
>
1903 JACKSON AVE A, B 2023 Plans 2025-10-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 1:21:27 PM
Creation date
10/13/2025 1:20:17 PM
Metadata
Fields
Template:
Address Document
Street Name
JACKSON AVE
Street Number
1903
Unit
A, B
Permit
B2311-025
Year
2023
Notes
NEW DUPLEX AFTER DEMO OF EXISTING SFR
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DOUBLE TOP PLATE W/ EDGE NAILING <br />(STAGGER) <br />(E)SHEARWALL EDGE NAILING AT ALL PANEL <br />EDGES. BLOCKING AT ALL PANEL EDGES <br />WHERE APPLICABLE. <br />© EDGE NAILING TO HOLDOWN POST (FULL <br />HEIGHT) STAGGER INTO DOUBLE STUDS <br />OD STUDS @ 16" ON CENTER <br />OE PRESSURE TREATED SILL PLATE WITH <br />EDGE NAILING AND ANCHOR BOLTS PER <br />SHEARWALL SCHEDULE. <br />(E)TOP PLATE SPLICE NAILING TO BE (8) 16d <br />SINKERS (MIN). LAP 48" MINIMUM. <br />CENTER SPLICE ON STUD. <br />STD. SHEARWALL <br />W/0 RIM <br />©HOLDOWN PER SCHEDULE <br />AND PLAN (HDQ8—SDS3 <br />SHOWN) <br />OH COORDINATE ALL STUD <br />AND PLATE SIZES w/ <br />SHEARWALL SCHEDULE <br />REQUIREMENTS <br />OJ EDGE NAILING TO POSTS, <br />TRIM STUDS, AND KING <br />STUDS <br />OK BEARING STUD FOR <br />HEADER <br />ELEVATION <br />SHEARWALL EDGE NAILING TO BOTTOM <br />PLATE. EXTEND SHEATHING CONT. TO SILL. <br />PRESSURE TREATED SILL PLATE AND <br />ANCHOR BOLT PER SHEARWALL SCHEDULE. <br />USE 2x6 w/ A.B. ® 48" o.c. (MIN) <br />SHEAR CLIP PER SCHEDULE <br />LTP5 ON EXTERIOR —OR— A34 ON INTERIOR <br />SHEARWALL EDGE NAILING TO SILL PLATE <br />0 <br />FROST DEPTH <br />(18" MIN) <br />PER PLAN oMS <br />4" 0 PERFORATED PLASTIC PIPE. <br />CENTER IN ONE CUBIC FOOT OF FREE L PER <br />DRAINING GRAVEL AND DRAIN TO PLAN <br />APPROVED OUTFALL. <br />PLATE TO RIM JOIST & <br />BLOCKING CONN. PER <br />SHEARWALL SCHEDULE <br />FRAMING PER <br />SHEARWALL SCHEDULE: <br />(2) 2x— SHOWN <br />JOIST PER PLAN <br />(I —JOIST SHOWN) <br />(2) 16d NAILS @ <br />EA. <br />JOIST <br />8" WALL w/ #4 <br />BARS @ 18" <br />o/c EACH WAY. <br />(2) #4 BARS <br />TOP. HOOK VERTICAL BARS <br />INTO FOOTING — <br />ALTERNATE <br />HOOK DIRECTION. <br />FOOTING REINFORCING <br />PER PLAN/SCHEDULE <br />OA DOUBLE TOP PLATE W/ EDGE NAILING <br />(STAGGER) <br />(D)SHEARWALL EDGE NAILING AT ALL PANEL <br />EDGES. BLOCKING AT ALL PANEL EDGES <br />WHERE APPLICABLE. <br />OC EDGE NAILING TO HOLDOWN POST (FULL <br />HEIGHT) STAGGER INTO DOUBLE STUDS <br />DO STUDS @ 16" ON CENTER <br />OE PRESSURE TREATED SILL PLATE WITH <br />EDGE NAILING AND ANCHOR BOLTS PER <br />SHEARWALL SCHEDULE. <br />(E)TOP PLATE SPLICE NAILING TO BE (8) 16d <br />SINKERS (MIN). LAP 48" MINIMUM. CENTER <br />SPLICE ON STUD. <br />©HOLDOWN PER SCHEDULE AND <br />PLAN (HDQ8—SDS3 SHOWN) <br />(0)COORDINATE ALL STUD AND <br />PLATE SIZES w/ SHEARWALL <br />SCHEDULE REQUIREMENTS <br />JO EDGE NAILING TO POSTS, TRIM <br />STUDS, AND KING STUDS <br />OK BEARING STUD FOR HEADER <br />©RIMJOIST TO BE 1Y2" MIN <br />THICKNESS AT ALL <br />SHEARWALLS <br />STD. SHEARWALL ELEVATION <br />© EA, 1l <br />SHEARWALL EDGE NAILING TO BOTTOM <br />PLATE. EXTEND SHEATHING CONT. TO SILL. <br />PRESSURE TREATED SILL PLATE AND <br />ANCHOR BOLT PER SHEARWALL SCHEDULE. <br />USE 2x6 w/ A.B. @ 48" o.c. (MIN) <br />SHEAR CLIP PER SCHEDULE <br />LTP5 ON EXTERIOR —OR— A34 ON INTERIOR <br />SHEARWALL EDGE NAILING TO SILL PLATE <br />6" <br />FROST DEPTH <br />(18" MIN) <br />PER PLAN <br />0 <br />4" 0 PERFORATED PLASTIC PIPE. J <br />CENTER IN ONE CUBIC FOOT OF FREE PER <br />DRAINING GRAVEL AND DRAIN TO PLAN <br />APPROVED OUTFALL. <br />*BREAK SHEARWALL SHEATHING Cam? BOTTOM OF SILL PLATE <br />JOISTS PERPENDICULAR <br />EXT. WALL/FOUNDATION <br />SH EAR WALLS 1 — 5 <br />CONNECTION APPLICABLE FOR <br />PLATE TO RIM JOIST & BLOCKING <br />CONN. PER SHEARWALL SCHEDULE <br />FRAMING PER <br />SHEARWALL SCHEDULE: <br />(2) 2x— SHOWN <br />JOIST PER <br />PLAN <br />(I —JOIST <br />SHOWN) <br />'--BLOCKING @ 48" o.c. w/ <br />(3) 10d NAILS <br />8" WALL w/ #4 BARS @ 18" o.c. <br />EACH WAY. (2) #4 BARS © TOP. <br />HOOK VERTICAL BARS INTO FOOTING — <br />ALTERNATE HOOK DIRECTION. <br />I� <br />FOOTING REINFORCING <br />PER PLAN/SCHEDULE <br />JOISTS PARALLEL <br />Cn <br />> O N <br />Q N O00 <br />U <br />r <br />ry m ro <br />0 <br />W Q n <br />N <br />O <br />N <br />a� <br />4� <br />U <br />co � L<i <br />)U) <br />::3 <br /><O <br />a) z <br />O > o <br />3: <br />3: <br />L <br />LLJ _ <br />3: <br />+J <br />n <br />(f) <br />z <br />0 <br />o <br />:m) <br />> <br />L <br />Of <br />w <br />� <br />J <br />U <br />J <br />U <br />m <br />to <br />N <br />d <br />N <br />i <br />i <br />CoLLJ <br />Ln <br />7 <br />Q <br />p <br />i <br />o <br />� <br />o <br />x <br />LLJ <br />� Lv <br />� > N <br />0 00 <br />z0-) <br />W0Q <br />Q U <br />Q <br />zD <br />0r� cl� <br />O LLJ <br />� � W <br />U <br />Q <br />FEB 19, 2024 <br />Drawn By: CHRIS L. <br />Checked By: CHRIS <br />Date: 02-15-2024 <br />SDA JOB NO. <br />9902 <br />STRUCTURAL <br />DETAILS <br />5-5.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.