My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1903 JACKSON AVE A, B 2023 Plans 2025-10-13
>
Address Records
>
JACKSON AVE
>
1903
>
Plans
>
1903 JACKSON AVE A, B 2023 Plans 2025-10-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2025 1:21:27 PM
Creation date
10/13/2025 1:20:17 PM
Metadata
Fields
Template:
Address Document
Street Name
JACKSON AVE
Street Number
1903
Unit
A, B
Permit
B2311-025
Year
2023
Notes
NEW DUPLEX AFTER DEMO OF EXISTING SFR
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U E-AME-D DCD DI AAI <br />(5)16d NAILS <br />EACH END <br />2x_ KING S1 <br />16d NAILS <br />0 <br />HEADER CONNECTION <br />AT TOP <br />^o^^^r_^ BEAM PER PLAN <br />RIM JOIST <br />MST27 STRAP ACROSS ANY BREAKS <br />IN TOP PLATE. CENTER ON BEAM <br />5)16d NAILS EACH SIDE, <br />LING STUD TO BEAM AND <br />"ING STUD TO POST <br />BEARING WALL <br />PER PLAN <br />2x KING STUD EACH SIDE OF <br />BEAM. NAIL TO POST w/ 10d <br />STAGGERED © 6" o/c <br />I \l.J I VI\ IVI%J LI I I- LL <br />STUDS PER PLAN <br />DROPPED BEAM/WALL <br />CONNECTION <br />SHEARWALL PER PLAN <br />PANEL EDGE NAILING PER <br />SHEARWALL SCHEDULE <br />10d @ 6" o/c DIAPHRAGM EDGE <br />NAILING U.N.O. <br />SHEAR CLIP PER SHEARWALL <br />SCHEDULE <br />SECURE JOIST TOP & BOTTOM <br />FLANGE w/ 10d NAILS <br />SHEATHING RIBBON TO MATCH <br />TOP & BOTTOM SHEATHING <br />SHEAR CLIP PER SHEARWALL <br />SCHEDULE <br />Y8" WALL SHEATHING GAP (TYP.) <br />PANEL EDGE NAILING PER <br />SHEARWALL SCHEDULE <br />SHEARWALL PER PLAN <br />FRAMING PER <br />SHEARWALL SCHEDULE, <br />(2) 2x_ SHOWN <br />16d © EA. JOIST <br />TJI JOIST <br />PER PLAN <br />1Y" THK LSL <br />RhJOIST U.N.O. <br />62) 16d NAILS <br />EA. JOIST <br />JOISTS PERPENDICULAR <br />SF <br />3"--i I~12 <br />. m I <br />BUILT-UP HEADER <br />PER PLAN <br />2x- TRIMMER OR <br />POST PER PLAN <br />(2) 12d <br />COMMON <br />12" o.c. <br />2—PLY w/ <br />_JI /-)VLI\ <br />(3) 8d <br />COMMON @ <br />12" o.c. <br />2—PLY w/o <br />.JI !1\1Ll \ <br />(2) 12d (3) 8d <br />COMMON COMMON @ <br />12" o.c. 12" o.c. <br />EACH SIDE EACH SIDE <br />3—PLY w/ 3—PLY w/8d <br />12d COMMON COMMON <br />BUILT—UP HEADER CON N. <br />BUILT-UP HEADER TO SOLID <br />SAWN EQUIVALENT <br />HEADER <br />PLAN <br />PER <br />SUITABLE <br />REPLACEMENT <br />(2)-2x6 HF <br />No.2 <br />4x6 HF No.2 <br />(2)-2x8 HF <br />No.2 <br />4x8 HF No.2 <br />(2)-2x10 HF <br />No.2 <br />4x10 HF No.2 <br />(2)-2x12 HF <br />No.2 <br />4x12 HF No.2 <br />(3)-2x6 HF <br />No.2 <br />4x8 HF No.2 <br />(3)-2x8 HF <br />No.2 <br />4x10 HF No.2 <br />(3)-2x10 HF <br />No.2 <br />4x12 HF No.2 <br />(3)-2x12 HF <br />No.2 <br />6x12 HF No.2 <br />NOTE: SOLID <br />REPLACED <br />SAWN <br />WITH <br />HEADERS MUST NOT BE <br />BUILT-UP MEMBERS. <br />HOLDOWN POST PER <br />PLAN. (2)2x MINIMUM MSTC48133 <br />STRAP PER <br />NAIL FLOOR SHEATHING PLAN <br />TO DRAG STRUT/BEAM FRAMING PER PLAN <br />w/ 10d ® 6" o/c (DRAG STRUT) <br />SST/STUDS PER PLAN <br />STRAP PER PLAN AT BEAM <br />BREAK. CENTER STRAP ON <br />\N FROM BEAM BREAK. NAIL PER <br />TOP PLATE. MANUFACTURER'S SPECS. <br />ON <br />)F MEMBERS. <br />1FACTURER'S <br />DRAG STRUT/WALL CONNECTION <br />SHEARWALL PER PLAN <br />PANEL EDGE NAILING PER <br />SHEARWALL SCHEDULE <br />10d @ 6" o/c DIAPHRAGM EDGE <br />NAILING U.N.O. <br />SHEAR CLIP PER SHEARWALL <br />SCHEDULE <br />SECURE JOIST TOP & BOTTOM <br />FLANGE w/ 10d NAILS <br />SHEATHING RIBBON TO MATCH <br />TOP & BOTTOM SHEATHING <br />SHEAR CLIP PER SHEARWALL <br />SCHEDULE <br />Ys" WALL SHEATHING GAP (TYP.) <br />PANEL EDGE NAILING PER <br />SHEARWALL SCHEDULE <br />SHEARWALL PER PLAN <br />FLOOR/FLOOR CONNECTION APPLICABLE FOR <br />FRAMING PER <br />SHEARWALL SCHEDULE, <br />(2) 2x- SHOWN <br />1Y" THK LSL <br />RhJOIST U.N.O. <br />JOIST PER <br />a PLAN <br />(I -JOIST <br />SHOWN) <br />BLOCKING @ 48" o.c. w/ <br />(3) 10d NAILS @ TOP & <br />(2) 16d @ BOT. <br />JOISTS PARALLEL <br />START NAILS 1Y2" UP <br />FROM END OF STUD <br />FACE NAILS <br />1 <br />(5)16d NAILS - <br />FROM KING STUD <br />TO HEADER BEAM PER PLAN-/ <br />\_MSTC48B3 STRAP EACH END <br />16d @ 8" o/c OF BEAM <br />FROM KING STUD <br />TO TRIM STUD TRIM STUD/POST PER PLAN. (2)2x <br />MINIMUM. SEE PLAN FOR HOLDOWN <br />REQUIREMENTS AT BASE <br />H OLDOWN AT BEAM <br />CLEAR SPAN <br />NO NAILS <br />REQUIRED <br />DOUBLE STUD OR <br />PER PLAN <br />STRAP PER PLAN - <br />CENTER BETWEEN <br />FLOORS. <br />FLOOR FRAMING <br />PER PLAN <br />DOUBLE STUD OR <br />PER PLAN <br />FLOOR TO FLOOR <br />Q� <br />0 <br />>CDN O <br />Q� <br />QN0 C) <br />o0 rn <br />C) ro -+-' <br />w Q � <br />U <br />v�� > <br />Cf) <br />N a) <br />Of 0 <br />U <br />< <br />O Q) z <br />O > o 3 <br />r4-)LJ= <br />z <br />o <br />o <br />>> <br />V) <br />> <br />U) <br />- <br />Ld <br />w <br />J <br />J <br />0 <br />U <br />U <br />m <br />N <br />N <br />I <br />I <br />o <br />� <br />T <br />Q <br />m <br />1 <br />N <br />o <br />0 <br />Z <br />o <br />LLJ <br />LIJ <br />O <br />00 <br />zOF) <br />W 0 Q <br />Q U <br />QLLJ <br />I- <br />0rq <br />(f O W <br />vT-w <br />U <br />Q <br />D <br />FEB 19, 2024 <br />Drawn By: CHRIS L. <br />Checked By: CHRIS <br />Date: 02-15-2024 <br />SDA JOB NO. <br />9902 <br />SH EAR WALLS 1 <br />5 USTRAP <br />STRUCTURAL <br />DETAILS <br />S-6.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.