Laserfiche WebLink
SCALE 1" = 20' <br />0 20 40 <br />LEGEND <br />SET 1/2- X 24' RESAR W/CAP STAMPED 'PCS 37536- <br />O <br />EXISTING REHI W/CAP, AS NOTED <br />X <br />SET NAIL AND WASHER STAMPED "VCS 37536- <br />L( <br />EXISTING NAIL AND WASHER AS NOTED <br />OFOUND <br />CONCRETE MONUMENT AS NOTED <br />RIGHT OF WAY CENTERLINE <br />® <br />STORM DRAIN MANHOLE <br />J <br />INVERT/CULVERT <br />❑ <br />CATCH BASIN <br />M <br />WATER VALVE <br />FIRE HYDRANT <br />® <br />WATER METER <br />pS <br />SANITARY SEWER MANHOLE <br />AL4ILBOX <br />SIGN POST <br />4 <br />U77UTY/POWER POLE <br />GUY AMCHOR <br />© <br />POWER VAULT <br />ff <br />..K <br />CONIFEROUS TREE <br />DDECIDUOUS <br />TREE <br />F <br />FIR <br />C <br />CEDAR <br />P <br />PINE <br />S <br />SPRUCE <br />CW <br />COTTONWOOD <br />A <br />ALDER <br />I J// <br />I <br />SSMH RIM=374.70 <br />INV. 8 W(N)=367.45 j <br />INV. 8'PVC(S)=367.35 <br />I <br />I <br />i <br />i <br />I <br />I <br />I <br />I <br />SSMH RIM=373.75 j <br />NOT MEASURED. D ;h( <br />PAVED SHUT COULD YI/ <br />NOT OPEN <br />FOUND CASED CONC. MON. <br />W/ INVERTED AWL, DOWN 0,2' <br />VISITED 8103123 <br />INV. <br />_`7 ND PL SE <br />x eM2' MIN SETBACK <br />sxsr r�suvc <br />�xu cur s�axs <br />TYP CUT & FILL SECTION <br />AT PROPERTY LINE <br />LOP, 2 <br />OF EVERETT SHOW PLAT SP 1202- <br />UNDER AFN 910E1250420 & AFN 9 <br />INV CV)=372.75 GRAVEL <br />'i <br />Ila <br />LLl AREAQA IX. BNCBI <br />y I E AREAOB <br />j <br />7 � 1 <br />AREAQA <br />0 <br />FH <br />y SL#2@ <br />AREAQB - <br />/821'55" W 89.89' <br />________ <br />LL SSMH RIM=369.73 <br />INV. 87✓C(E)=358.98 <br />��`+ INV. 87VC(W)=359.OB <br />4 <br />CB RIM=3E <br />INVINV. 8 CONCON <br />I <br />I <br />Q USE EX. CAPED 6" SEWER IINE <br />® SS CLEANOUT <br />SOIL MANAGEMENT PLAN (BMP 5,13): <br />AREA( : AMEND EXISTING SOIL IN -PLACE (2-INCH OF COMPOST) -25 C. Y <br />AREA©: TOPSOIL (MIN. B" OF TOP SOIL)- 41 C.V. <br />NW 114 NW 114, SEC.8, T.28N., R.5E,, W.M. <br />SHED <br />ALLEY <br />101 <br />LOT 23 <br />PINEHURS DIV. "B' <br />BLK. 28, VqL.8, PG. 18 <br />I <br />LOT 24 LOT 25 <br />4 SET NAIL/WASHER 10'(S) OF CORNER <br />ON PROPERTY LINE EXTENDED <br />JACKSON A VE 9 434,13• STRUCTURE <br />N 88'21'55'W 50737'_______.__ <br />ASPHALT ROADWAY <br />Su.S��- Q� �C.k1 z�z3/mot <br />�I- CowCk y53( S <br />(f\� fok (oWUl0`lh <br />Q1 4" DIA. PVC PIPE (TYP) <br />© YARD DRAIN (TYP) <br />3Q CB TYP 1 <br />BMP T5.10B (48') DISPERSION TRENCH W/ NOTCHED GRADE BOARD <br />PER FIGURE V-4.5 2019 Stonmwater Management Manual for Western Washington <br />Q BMP T5.12 SHEET ROW DISPERSION <br />PER FIGURE V-3.2 Sheet Flow Dispersion for Driveways <br />2019 Stormwater Management Manual for Western Washington <br />BMP T5.13 POST -CONSTRUCTION SOIL QUALITY AND DEPTH IS ACHIEVED BY IMPLEMENTING <br />BEST MANAGEMENT PRACTICE. SOILS THAT HAVE BEEN DISTURBED, WILL BE AMENDED <br />ACCORDING TO THE FOLLOWING PROCEDURES: <br />A SCARIFY SUBSOIL TO A DEPTH OF ONE FOOT. <br />B. IN PLANTING BEDS, WILL PLACE THREE INCHES OF COMPOST AND TILL IN TO AN EIGHT -INCH DEPTH. <br />C. IN TURF AREAS, WILL PLACE TWO INCHES OF COMPOST AND TILL IN TO AN EIGHT -INCH DEPTH. <br />D. APPLY TWO TO FOUR INCHES OF ARBORIST WOOD CHIP, COARSE BARK MULCH, OR COMPOST MULCH <br />TO PLANTING BEDS AFTER FINAL PLANTING. <br />UNDISTURBED SOILS WILL BE PROTECTED FROM COMPACTION DURING CONSTRUCTION <br />PRESERVE NATIVE SOILS BY STOCKPILING SITE DUFF AND TOPSOILS AND REAPPLY AFTER GRADING AND <br />CONSTRUCTION. <br />ADDITIONAL GRADING AND EROSION CONTROL NOTES: <br />1. ADDITIONAL SEDIMENTATION CONTROL MAYBE REQUIRED <br />DURING THE CONSTRUCTION PROCESS. <br />2. NO EXPOSED SOILS ON -SITE LONGER THAN 48 HRS. <br />COVER USING MULCHES OR VISQUEEN. THISAPPLIES TO <br />SOIL STOCK PILES AS WELL <br />NOTE: <br />EXISTING STRUCTURES, DRIVEWAYS, <br />AND WALKWAYS WILL BE REMOVED AND <br />REPLACED BY NEW SINGALE FAMILY <br />DUPLEX AND ASSOCIATED <br />IMPROVEMENTS <br />CALL 811 BEFORE FOUDIG <br />0 , <br />STORM DRAINAGE NOTES <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN <br />INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS <br />AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL <br />CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE <br />SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND <br />TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING <br />CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED <br />SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE <br />PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGKT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR <br />LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, LAKE, <br />RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. <br />6. DESIGN SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE (EMC), CITY ADOPTED STORMWATER <br />MANAGEMENT MANUAL, POLICIES AND CRITERIA SET FORTH IN THE CITY OF EVERETTS DESIGN AND <br />CONSTRUCTION STANDARDS & SPECIFICATIONS. <br />SITE PREPERATION NOTES <br />1. VERIFY SITE CONDITIONS PRIOR TO CONSTRUCTION. NOTIFY THE PROJECT MANAGER OF ANY <br />VARIATION PRIOR TO COMMENCEMENT OF WORK. <br />2. BEFORE ANY LAND DISTURBING ACTIVITY BEGINS, DOWN -SLOPE AND SLOPE -PERIMETER EROSION <br />AND SEDIMENT CONTROL MEASURES MUST BE IN PLACE AND MEETING BEST MANAGEMENT <br />PRACTICES (BMPs) PER WASHINGTON STATE DEPARTMENT OF ECOLOGY REQUIREMENTS. <br />3. PRIOR TO THE PLACEMENT OF ANY FILL OF PAVEMENT CONSTRUCTION , ALL TOPSOIL SURFACE <br />VEGETATION, AND ANY SOFT OR LOOSE SOILS SHALL BE COMPLETELY REMOVED FROM TO PROPOSED <br />CONSTRUCTION AREAS. TOPSOIL OF OTHER SUCH MATERIAL CONTAINING ORGANIC MATTER SHALL <br />NOT BE USED AS FILL BUT MAY BE STOCKPILED AND USED FOR LANDSCAPING PURPOSES. <br />4. ISOLATED SOFT OR LOOSE AREAS, WHICH ARE UNDERCUT SHOULD BE BACKFILLED WITH MATERIAL <br />COMPACTED TO THE ADJACENT SOIL DENSITY. <br />5. IN AREAS TO BE FILLED OF PAVING, THE SURFACE OF THE STRIPPED SOIL SHOULD BE DISKED OR <br />SCARIFIED TO A DEPTH OF 6 INCHES AND RE -COMPACTED BEFORE PLACING FILL OR PAVEMENT <br />BASE <br />MATERIAL. <br />6. PLACE ANY FILL REQUIRED TO RAISE THE GRADE OF THE SITE IN 6 INCH LAYERS AND COMPACT. <br />7. ALL NEWLY -CUT OR FILLED AREAS ARE TO BE MULCHED TO ADEQUATELY CONTROL SOIL EROSION <br />PRIOR TO FINAL LANDSCAPING COMPLETED BY CLIENT. <br />8. THE MAXIMUM ALLOWABLE SLOPE ON THIS PROJECT IS 2H:1V <br />9. ALL ELEVATIONS SHOWN ARE TO FINISHED GRADE UNLESS OTHERWISE INDICATED. <br />10. CALL BEFORE YOUR DIG FOR LOCATION OF UNDERGROUND UTILITIES. <br />11. ALL UTILITY TRENCHES SHALL MEET EACH UTILITY'S REQUIREMENTS <br />12. THE INDICATED LOCATIONS OF UNDERGROUND UTILITIES ARE APPROXIMATE. EACH INDIVIDUAL <br />UTILITY SHALL BE COORDINATED WITH THE INSTALLATION OF ADJACENT AND CROSSING UTILITIES. <br />13. PROPERTY LINES SHALL BE VERIFIED PRIOR TO INSTALLATION OF EROSION CONTROL MEASURES, <br />CONSTRUCTION, GRADING, CLEARING, AND TREE REMOVAL TREE REMOVAL ON SHARED ACCESS <br />SHALL BE DONE UNDER CONTRACT WITH SHARED ACCESS PROPERTY OWNER OR DIRECTLY BY CLIENT. <br />CONSTRUCTION SEQUENCE: <br />1. ATTEND PRE -CONSTRUCTION CONFERENCE. <br />2. INSTALL T.E.S.C. MEASURES. <br />3. CLEAR AND GRADE SITE. <br />4. INSTALL STORM DRAINAGE SYSTEM. <br />5. INSTALL SEWER AND WATER SYSTEM. <br />6. GRADE ROAD. <br />7. AS -BUILT. <br />8. REMOVE T.E.S.C. MEASURES. <br />EXISTING IMPERVIOUS AREA: <br />HOUSE STRUCTURES <br />2,008 SF <br />SHED <br />322 SF <br />DRIVEWAYS <br />1,748 SF <br />WALKWAYS <br />874 SF <br />TOTAL <br />4,952 SF <br />TOTAL PARCEL AREA 9,881 S.F <br />AREA OF DISTURBANCE: 9,881 S.F. <br />SITE GRADING: 170 CY CUT AND FILL <br />NEW IMPERVIOUS AREA <br />DUPLEX STRUCTURE (INCL OVERHANG) <br />3,311 SF <br />DRIVEWAYS <br />902 SF <br />WALKWAYS <br />221 SF <br />TOTAL <br />4,434 SF <br />MAHER WELAYE, P.E. <br />15516 - 56TH AVE. IN �. <br />EDMONDS, WA 98026 OL <br />PH: (206) 816-0455 <br />l <br />LI� MAR 0 5 2024 L <br />LEGAL DESCRIPTION CITY Cr EVERETT <br />LOTS 19, 20, 21, AND 22, BLOCK 28, PLAT OF PINEHURST DIVISION 'B, P6'TTR-I services <br />ACCORDING TO THE PUT THEREOF RECORDED IN VOLUME 8 OF PLATS, <br />PAGE 18, IN SNOHOMISH COUNTY, WASHINGTON, <br />EXCEPT ME EAST 10 FEET OF SAID LOT 22. <br />VERTICAL DATUM <br />R NA VD 88 (NAVD W-367' = NGw 29) <br />FOUND CASED MON W17NVDM NAIL SET IN <br />CONC. NEAR THE INTERSECTION OF MOWN ST <br />AND WETMORE AVE. <br />ELEVATION = 382.80' <br />SURVEY REFERENCES <br />(R1) PLAT OF PINEHURST DIVISION -9- - VOL 8, PG. 18 <br />�� <br />F <br />(R2) RECORD OF SURVEY - AFN 201307105002 <br />W m <br />ai <br />(R3) SHORT PUT SP 1202-1-91 - AFN 9106255003 <br />o W� <br />W rail' <br />n^ <br />Fa <br />V� <br />o U <br />EQUIPMENT & PROCEDURES <br />METHOD OF SURVEY.' <br />SURVEY PERFORMED BY FIELD TRAVERSE AND REAL TIME KINEMATIC <br />GAS POSITIONING UTILIZING THE H,,GN SMARTNET NETWORK <br />INSTRUMENTATION: <br />LEMA TS16 ROBOTIC ELECTRONIC TOTAL STATION <br />LEICA VIVA GNSS GSOB RECEIVER <br />ALL EQUIPMENT HAS BEEN MAINTAINED IN ADJUSTMENT TO <br />MANUFACTURER'S SPECIFICATIONS AS REQUIRED BY WAC 331-130-100 <br />PRECISION: <br />MEETS OR EXCEEDS STATE STANDARDS SET BY WAC 332-130-080 <br />THROUGH 332-130-110 <br />BASIS OF BEARING: <br />THE MONUAIENTED CENTERLINE OF WETMORE AVE AS THE BEARING OF <br />NORTH 01,0314' EAST. <br />NOTES <br />1.) THIS SURVEY HAS BEEN PREPARED FOR THE EXCLUSIVE USE OF PARTIES <br />WHOSE MANTES APPEAR HEREON ONLY, AND DOES NOT EXTEND TO ANY <br />UNNWEO THIRD PARTIES WITHOUT EXPRESS RECERTIFICATION BY THE LAND <br />SURVEYOR OF RECORD. <br />2.) BOUNDARY LINES SHOWN AND CORNERS SET REPRESENT DEED LOCATIONS <br />OWNERSHIP LINES MAY VARY. NO GUARANTEE OF OWNERSHIP IS EXPRESSED <br />OR IMPLIED. THIS SURVEY WAS PERFORMED WITHOUT THE BENEFIT OF A TITLE <br />REPORT AND DOES NOT PURPORT TO SHOW ALL EASEMENTS, RESTRICTIONS, <br />RESERVATIONS, AND OCCUPATION WHICH M4Y ENCUMBER TITLE OR USE OF <br />SUBJECT PROPERTY. <br />3.) RECORD SEWER LINE FROM CITY OF EVERETT CIS <br />PROJECT/SITE INFORMATION <br />SITE ADDRESS PARCEL NUMBER: <br />CURRENT ZONNING R-2 <br />1903 Jeck.. Ave. 00545002801900 <br />COMP PLAN: SF <br />EVERET, WA 98203 <br />LOT SIZE 9,881 S.F. <br />L.J\ <br />APPLICANT/CONTACT/OWNER: <br />ALLOWABLE LOT COVERAGE: % I V / <br />BUILDING AREA 2,B00 S.. <br />NAPA HOMES LLC <br />LOT COVERAGE 28.34 % <br />NAPAHOESIGNCAOMAIL.COM <br />425-268-2515 <br />ALLOWABLE IMPERVIOUS COVERAGE: 50 % <br />TOTAL IMPERVIOUS AREA 4,434 S.F. <br />IMPERVIOUS SURFACE COVERAGE: 44.87 % <br />BUILDING HEIGHT LIMIT: 28' <br />DATE: DESIGN MW I903 JACKSONAVEE. SCALE 20 <br />2 22 2024 <br />DRAWN DUPLEX JOB NO. <br />MW 2023-01 <br />CHECKED SHEET <br />MW SITE PLAN 1 <br />DATE OF <br />3 <br />OCT., 2023 <br />