Laserfiche WebLink
NW 114 NW 114, SEC.8, T.28N., R.5E., W.M. <br />EROSION CONTROL NOTES <br />LEGAL DESCRIPTION <br />INV. <br />I <br />I <br />_ a, <br />Q <br />NOT MEASURED. LID <br />PAVED SHUT COULD I I $ <br />NOT OPEN <br />� W <br />I W <br />FOUND CASED CONC. MON. <br />W/ INVERTED NAIL, DOWN 0.2' 1 <br />VISITED 8/03/23 <br />�, ,,I y gREAOA <br />-- _ 1 O <br />INV. 8 PVO N-J55.50 <br />INV. 8 PVC(S)-J65.40 6•L�fO <br />B CONC(SW)(RECORD) ...•, IX' fH q <br />72ND P! SE - \ <br />N <br />I i O <br />I <br />I I <br />LEGEND <br />SET 1/2- X 24- REBAR W/CAP STAMPED PCS 37536' <br />O EXISTING REBAR W/C4P, AS NOTED <br />x SET NAIL AND WASHER STAMPED PCS 37536' <br />9 EXISTING NAIL AND WASHER AS NOTED <br />OFOUND CONCRETE MONUMENT AS NOTED <br />RIGHT OF WAY CENTERUNE <br />® STORM DRAIN MANHOLE <br />INVERT/CULVERT <br />❑ CATCH BASIN <br />M WATER VALVE <br />FIRE HYDRANT <br />E3 WATER METER <br />Q SANITARY SEWER MANHOLE <br />o MAILBOX SCALE: 1" = 20' <br />SIGN POST 0 20 40 <br />4 UTILIlY/POWER POLE <br />GUY ANCHOR <br />©J POWER VAULT <br />Y CONIFEROUS TREE <br />0 DECIDUOUS TREE <br />F RR <br />C CEDAR <br />P PINE <br />S SPRUCE <br />CW COTTONWOOD <br />A ALDER <br />LOP 2 1 <br />CITY�OF EVERETT SHO T PLAT SP 1202-1-91 <br />:CORDED UNDER AFN 910g250420 & AFN 9106255003 <br />I I <br />I <br />HOUSE <br />/lL!lXiL/1LlUl/� � I <br />�i SHED <br />..ev <br />Te •.d <br />STO ILE 1 <br />b <br />.I <br />R REM 24 EX• BUILDII G /1 <br />+A ('HOURS) � I <br />G9,11 q <br />;rJAAWNING 1 ARE <br />8 ! I PINEHURS DIV. B" <br />BLK. 28, V L8, PG. 18 <br />! I I <br />LOT 23 LOT 24 i LOT 25 <br />�nr <br />i <br />I I <br />o <br />-a <br />I <br />88 <br />lJ <br />r9 / <br />4 <br />,,a ...,., <br />-ss - <br />SET WL/WASHER 10'(S) OF CORNER <br />•'I ON PROPERTY LINE EXTENDED I <br />N 88'21'55' W 89.89 <br />! JA CKSON AVE �" <br />�Rl.­16.9. <br />_-_4J4.4J' STRUCNRE TO S LURE <br />'N88'21'55'W 50737'-_-_-_-_-_-_-_-_, <br />ASPHALT ROADWAY <br />INV. BPw(E)-35 <br />INV BPVO(W)-J59.08.OB <br />- 4 <br />SOIL MANAGEMENT PLAN (BMP 5.13): <br />AREAOA : AMEND EXISTING SOIL IN -PLACE (2-INCH OF COMPOST) -25 C. Y. <br />AREA©: TOPSOIL (MIN. 8" OF TOP SOIL)- 41 C.Y. <br />BMP T5.13 POST -CONSTRUCTION SOIL QUALITY AND DEPTH IS ACHIEVED BY IMPLEMENTING <br />BEST MANAGEMENT PRACTICE. SOILS THAT RAVE BEEN DISTURBED, WILL BE AMENDED <br />ACCORDING TO THE FOLLOWING PROCEDURES: <br />A SCARIFY SUBSOIL TO A DEPTH OF ONE FOOT. <br />B. IN PLANTING BEDS, WILL PLACE THREE INCHES OF COMPOST AND TILL IN TO AN EIGHT -INCH DEPTH. <br />C. IN TURF AREAS, WILL PLACE TWO INCHES OF COMPOST AND TILL IN TO AN EIGHT -INCH DEPTH. <br />D. APPLY TWO TO FOUR INCHES OF ARBORIST WOOD CHIP, COARSE BARK MULCH, OR COMPOST MULCH <br />TO PLANTING BEDS AFTER FINAL PLANTING. <br />UNDISTURBED SOILS WILL BE PROTECTED FROM COMPACTION DURING CONSTRUCTION. <br />PRESERVE NATIVE SOILS BY STOCKPILING SITE DUFF AND TOPSOILS AND REAPPLY AFTER GRADING AND <br />CONSTRUCTION. <br />PM1 <br />,E 2' MIN SETBACK <br />r rni sloe <br />`M/,M cur swPE <br />CALL 811 BEFORE YOU DIG <br />10. <br />NOTE: <br />EXISTING STRUCTURES, DRIVEWAYS, <br />AND WALKWAYS WILL BE REMOVED AND <br />REPLACED BY NEW SINGALE FAMILY <br />DUPLEX AND ASSOCIATED <br />IMPROVEMENTS <br />A. ALL ENVIRONMENTALLY SENSITIVE AREAS AND THERE BUFFERS SHALL BE FLAGGED FOR EASY IDENTIFICATION BEFORE CLEARING TAKES PLACE. <br />AFTER THESE AREAS ARE FLAGGED AND CLEARING LIMITS ARE APPROVED, AN AREA WIDE ENOUGH TO INSTALL A SILT FENCE AT THE CLEARING LIMITS, <br />BY HAND OR MECHANICAL METHODS, MAY BE CLEARED. THE TOP OF THE SILT FENCE SHALL BE REFLAGGED AFTER THE INSTALLATION. IF A SILT FENCE IS <br />NOT REQUIRED, THE AREA SHALL BE DELINEATED USING AN ORANGE BARRIER. <br />S. ALL PERIMETER AND SEDIMENT CONTROL SHALL BE CONSTRUCTED, OPERATIONAL, AND INSPECTED BY THE PUBLIC WORKS INSPECTOR PRIOR TO <br />INITIATION OF CLEARING AND GRUBBING OPERATIONS. <br />C. DANGER TREES SHALL BE IDENTIFIED THROUGH A JOINT INSPECTION INVOLVING BOTH THE DEVELOPER AND PUBLIC WORKS INSPECTOR. NO TREES <br />SHALL BE REMOVED UNTIL PERMISSION IS OBTAINED FROM THE APPROPRIATE PARTIES. <br />D. WHERE POSSIBLE, NATURAL VEGETATION SHALL BE MAINTAINED FOR EROSION AND SEDIMENT CONTROL. <br />E. AS CONSTRUCTION PROGRESSES AND SEASONAL CONDITIONS DICTATE, THE EROSION CONTROL FACILITIES SHALL BE MAINTAINED AND/OR ALTERED <br />AS REQUIRED TO ENSURE CONTINUING EROSIOWSEDIMENT CONTROL. <br />F. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMP'S SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH A71ME THAT CLEARING <br />AND/OR CONSTRUCTION IS COMPLETED, PERMANENT DRAINAGE FACILITIES ARE OPERATIONAL, AND THE POTENTIAL FOR EROSION HAS PASSED. <br />G. AT A MINIMUM, EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE MAINTAINED MONTHLY, OR FOLLOWING EACH RUNOFF -PRODUCING STORM, TO <br />ENSURE PROPER OPERATION OF ALL EROSION AND SEDIMENT CONTROL FACILITIES. <br />H. APPROVAL OF THIS PLAN DOES NOT CONSTITUTE AN APPROVAL OF DESIGN, SIZE, NOR LOCATION OF PERMANENT PIPES, RESTRICTORS, OR DETENTION <br />FACILITIES; BUT IS AN APPROVAL OF EROSION AND SEDIMENT CONTROL BMP'S ONLY. <br />I. THE PUBLIC RIGHT-OF-WAY SHALL BE KEPT CLEAN. TRACKING OF MUD AND DEBRIS FROM THE SITE WILL NOT BE ALLOWED, FAILURE TO COMPLY WITH <br />THIS CONDITION WILL RESULT IN ALL WORK ON SITE BEING STOPPED. <br />J. THE WASHINGTON STATE CLEAN AIR ACT REQUIRES THE USE OF ALL KNOWN, AVAILABLE, AND REASONABLE MEANS OF WORK CONTROLLING AIR <br />POLLUTION, INCLUDING DUST. DUST CAN CAN BE CONTROLLED BY WETTING EXPOSED SOILS, WASHING TRUCK WHEELS BEFORE THEY LEAVE THE SITE, <br />AND INSTALLING AND MAINTAINING ROCK CONSTRUCTION ENTRANCES. CONSTRUCTION VEHICLE TRACKOUT IS A MAJOR SOURCE OF DUST AND ANY <br />EVIDENCE OF TRACK -OUT CAN TRIGGER FINES FROM THE DEPARTMENT OF ECOLOGY OR THE PUGET SOUND AIR POLLUTION CONTROL AGENCY. <br />K. EVERY EFFORT SHALL BE MADE TO CLOSE UTILITY LINES BY THE END OF THE DAY AND MATERIAL EXCAVATED DURING UNDERGROUND UTILITY <br />CONSTRUCTION SHALL BE PLACED ON THE UPHILL SIDE OF TRENCHES (WHERE CONSISTENT WITH SAFETY AND SPACE CONSIDERATIONS). <br />L. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE ANY SEDIMENT TRACKED OFF THE SITE. <br />M. THE CONTRACTOR SHALL PERFORM ROUTINE INSPECTION AND MAINTENANCE ON ALL INSTALLED EROSION AND SEDIMENT CONTROL BMP6, <br />ESPECIALLY AFTER STORMS. <br />N. APPROPRIATE MEASURED SHALL BE TAKEN TO STOP SEDIMENTS FROM ENTERING WATERWAYS IF THE PROPOSED BMPS FAIL. <br />O. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, <br />AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />SITE PREPERATION NOTES <br />1. VERIFY SITE CONDITIONS PRIOR TO CONSTRUCTION. NOTIFY THE PROJECT MANAGER OF ANY VARIATION <br />IA PRIOR TO <br />COMMENCEMENT OF WORK. <br />2. BEFORE ANY LAND DISTURBING ACTIVITY BEGINS, DOWN -SLOPE AND SLOPE -PERIMETER EROSION AND SEDIMENT <br />CONTROL MEASURES MUST BE IN PLACE AND MEETING BEST MANAGEMENT PRACTICES (BMPS) PER WASHINGTON <br />STATE DEPARTMENT OF ECOLOGY REQUIREMENTS. <br />3. PRIOR TO THE PLACEMENT OF ANY FILL OF PAVEMENT CONSTRUCTION, ALL TOPSOIL SURFACE VEGETATION, AND <br />ANY SOFT OR LOOSE SOILS SHALL BE COMPLETELY REMOVED FROM TO PROPOSED CONSTRUCTION AREAS. TOPSOIL <br />OF OTHER SUCH MATERIAL CONTAINING ORGANIC MATTER SHALL NOT BE USED AS FILL BUT MAY BE STOCKPILED AND <br />USED FOR LANDSCAPING PURPOSES. <br />4. ISOLATED SOFT OR LOOSE AREAS, WHICH ARE UNDERCUT SHOULD BE BACKFILLED WITH MATERIAL COMPACTED TO <br />THE ADJACENT SOIL DENSITY. <br />5. IN AREAS TO BE FILLED OF PAVING, THE SURFACE OF THE STRIPPED SOIL SHOULD BE DISKED OR SCARIFIED TO A <br />DEPTH OF 6 INCHES AND RE -COMPACTED BEFORE PLACING FILL OR PAVEMENT BASE MATERIAL. <br />6. PLACE ANY FILL REQUIRED TO RAISE THE GRADE OF THE SITE IN B INCH LAYERS AND COMPACT. <br />7. ALL NEWLY -CUT OR FILLED AREAS ARE TO BE MULCHED TO ADEQUATELY CONTROL SOIL EROSION PRIOR TO FINAL <br />LANDSCAPING COMPLETED BY CLIENT. <br />8. THE MAXIMUM ALLOWABLE SLOPE ON THIS PROJECT IS 2H:1V <br />9. ALL ELEVATtONS SHOWN ARE TO FINISHED GRADE UNLESS OTHERWISE INDICATED. <br />10. CALL BEFORE YOUR DIG FOR LOCATION OF UNDERGROUND UTILITIES. <br />11. ALL UTILITY TRENCHES SHALL MEET EACH UTILITY'S REQUIREMENTS <br />12. THE INDICATED LOCATIONS OF UNDERGROUND UTILITIES ARE APPROXIMATE. EACH INDIVIDUAL UTILITY SHALL BE <br />COORDINATED WITH THE INSTALLATION OF ADJACENT AND CROSSING UTILITIES. <br />13. PROPERTY LINES SHALL BE VERIFIED PRIOR TO INSTALLATION OF EROSION CONTROL MEASURES, CONSTRUCTION, <br />GRADING, CLEARING, AND TREE REMOVAL. TREE REMOVAL ON SHAREDACCESS SHALL BE DONE UNDER CONTRACT <br />WITH SHARED ACCESS PROPERTY OWNER OR DIRECTLY BY CLIENT. <br />STORM DRAINAGE NOTES <br />1. NO PART OF THE DRAINAGE SYSTEM SHALL BE COVERED, CONCEALED, OR PUT INTO USE UNTIL IT HAS BEEN <br />INSPECTED, TESTED, AND ACCEPTED BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL CONFORM TO THE CITY OF EVERETT DESIGN AND CONSTRUCTION STANDARDS <br />AND SPECIFICATIONS AND THE WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL <br />CONSTRUCTION (CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM AVAILABLE RECORDS AND ARE <br />SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND <br />TO AVOID DAMAGE TO ANY ADDITIONAL UTILITIES SHOWN. IF CONFLICTS WITH EXISTING UTILITIES ARISE DURING <br />CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED <br />SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED CONSTRUCTION ON THE <br />PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS MUST BE STAKED BY SURVEY FOR <br />LINE AND GRADE PRIOR TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE STENCILED OR STAMPED "DUMP NO WASTE, DRAINS TO STREAM, LAKE, <br />RIVER, PUGET SOUND, OR WETLAND." CHOOSE APPROPRIATE FEATURE FOR THE PROJECT. <br />S. DESIGN SHALL COMPLY WITH THE EVERETT MUNICIPAL CODE (EMC), CITY ADOPTED STORMWATER <br />MANAGEMENT MANUAL, POLICIES AND CRITERIA SET FORTH IN THE CITY OF EVERETTS DESIGN AND <br />CONSTRUCTION STANDARDS & SPECIFICATIONS. <br />1. ATTEND PRE -CONSTRUCTION CONFERENCE. <br />2. INSTALL T.E.S.C. MEASURES. <br />3. CLEAR AND GRADE SITE. <br />4. INSTALL STORM DRAINAGE SYSTEM. <br />5. INSTALL SEWER AND WATER SYSTEM. <br />8. GRADE ROAD. <br />7. AS -BUILT. <br />8. REMOVE T.E.S.C. MEASURES. <br />EXISTING IMPERVIOUS AREA: <br />HOUSE STRUCTURES <br />2,008 SF <br />SHED <br />3225F <br />DRIVEWAYS <br />1,748 SF <br />WALKWAYS <br />874 SF <br />TOTAL <br />4,952 SF <br />TOTAL PARCEL AREA: 9,881 S.F. <br />AREA OF DISTURBANCE: 9,881 S.F. <br />SITE GRADING: 170 CY CUT AND FILL <br />NOTES <br />LOTS 19, 20, 21, AND 22, BLOCK 28, PUT OF PINEHURST DIVISION T', <br />ACCORDING TO THE PLAT THEREOF RECORDED IN VOLUME 8 OF PLATS, <br />PAGE 18, IN SNOHOMISH COUNTY, WASHINGTON, <br />EXCEPT THE EAST 10 FEET OF SAID LOT 22. <br />SM14TE IN THE COUNTY OF SNOHOMISH, STATE OF WASHINGTON <br />VERTICAL DATUM <br />R NA VD 88 (1141) 88-3.67' - NGw 29) <br />FOUND CASED MON IV/INVERTED NAIL SET IN <br />CONC. NEAR THE INTERSECTION OF MADISON ST <br />AND WETMORE AVE. ELEVA77ON - 382.80' <br />SURVEY REFERENCES <br />(RI) PUT OF PINEHURST DMSION 6' - VOL. 8, PC. 18 <br />(R1) RECORD OF SURVEY - AFN 201J07105002 <br />(RJ) SHORT PUT SP 1202-/-91 - AFN 91062MJ <br />EQUIPMENT & PROCEDURES <br />METHOD OF SURVEY: <br />SURVEY PERFORMED BY FIELD TRAVERSE AND REAL TIME KINEM477C <br />CPS POSITIONING UTILIZING THE &CN SMARTNET NETWORK <br />INSTRUMENTATION: <br />LEICA TS16 R0907IC ELECTRONIC TOTAL STATION <br />LEICA VIVA CNSS GS08 RECENER <br />ALL EQUIPMENT HAS BEEN MAINTAINED IN ADJUSTMENT TO <br />MANUFACTURER'S SPEOFlCAPONS AS REQUIRED BY WAC 331-130-100 <br />PRECISION: <br />,VESTS OR EXCEEDS STATE STANDARDS SET BY WAC 332-130-080 <br />THROUGH 332-130-110 <br />BASIS OF BEARING: <br />THE MONUMENTED CENTERLINE OF WETMORE AVE, AS THE BEARING OF <br />NORTH 01'03'14' EAST. <br />1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF <br />PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND LOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, <br />RETENTION FACILITIES, UTILITIES). <br />2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND <br />UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY OF THE APPLICANT/CONTRACTOR UNTIL ALL <br />CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETA71OWLANDSCAPING IS ESTABLISHED. <br />3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD <br />PRIOR TO CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE FLAGGED <br />CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR <br />THE DURATION OF CONSTRUCTION. <br />4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND <br />GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER <br />DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br />S. THE ESC FACILITIES SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS <br />DURING THE CONSTRUCTION PERIOD, THESE ESC FACILITIES SHALL BE UPGRADED AS NEEDED FOR <br />UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT -LADEN WATER DO NOT LEAVE THE <br />SITE. 2023 DESIGN AND CONSTRUCTION STANDARDS AND SPECIFICATIONS EROSION AND SEDIMENTATION CONTROL <br />2-6 <br />6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO <br />ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER STORM EVENTS. <br />7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED MINIMUM OF ONCE <br />MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM EVENT. <br />8. AT NO TIME SHALL MORE THAN ONE FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A TRAPPED <br />CATCH BASIN. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING <br />OPERATION SHALL NOT FLUSH SEDIMENT LADEN WATER INTO THE DOWNSTREAM SYSTEM. <br />9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND <br />MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES MAY BE REQUIRED TO ENSURE THAT <br />ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br />10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED <br />OFF <br />THE SITE. <br />11. APPROPRIATE MEASURES SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE <br />PROPOSED BMPS FAIL. IF BMPS FAIL AND SEDIMENT -LADEN WATER IS LEAVING THE SITE, IMMEDIATELY NOTIFY <br />YOUR PUBLIC WORKS INSPECTOR. <br />12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS <br />FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO MORE THAN 7 DAYS FROM MAY 1 THROUGH SEPTEMBER 30. <br />13. NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO DEWATERING ACTIVITIES. HANDLE <br />HIGHLY TURBID OR OTHERWISE CONTAMINATED DEWATERING WATER SEPARATELY FROM STORMWATER. <br />14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL BE RETAINEDON SITE OR READILY <br />AVAILABLE <br />TO THE CONTRACTOR THROUGHOUT THE DURATION OF THE CONSTRUCTION PROJECT. <br />15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION PREVENTION MEASURES TO MINIMIZE THE <br />DISCHARGE OF POLLUTANTS. <br />16. PROTECT ALL LID BMPS FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE OF EROSION AND <br />SEDIMENT CONTROL BMPS ON PORTIONS OF THE SITE THAT DRAIN INTO THE LID BMPS. <br />NEW IMPERVIOUS AREA: <br />DUPLEX STRUCTURE (INCL. OVERHANG) 3,311 SF <br />DRIVEWAYS 902 SF <br />WALKWAYS 221 SF <br />TOTAL 4,438 SF <br />PROJECT/SITE INFORMATION <br />CURRENT ZONNING: R-2 <br />COMP PLAN: SF <br />LOT SIZE: 9,881 S.F. ��// <br />ALLOWABLE LOT COVERAGE. <br />;;S % L{p %0 <br />BUILDING AREA: 2.800 S. . <br />LOT COVERAGE 28.34 % <br />ALLOWABLE IMPERVIOUS COVERAGE: 50 % <br />TOTAL IMPERVIOUS AREA 4,434 S.F. <br />IMPERVIOUS SURFACE COVERAGE: 44.87 % <br />BUILDING HEIGHT LIMIT: 28' <br />SITE ADDRESS PARCEL NUMBER: <br />1903Jed®on Ave. 00545002801900 <br />EVERET, WA 98203 <br />APPLICANT/CONTACT/OWNER: <br />NAP. HOMER LLC <br />NAPAHDESIGNOGMAIL.COM <br />425466a515 <br />