Laserfiche WebLink
= CASE <br />PF ENGINEERING <br />Consulting Electrical Engineers <br />EvCC Olympus Hall Panel Replacement COE Responses <br />To: Steve Banks — Electrical Inspector <br />Date: February 22, 2024 <br />From: Tim Nichols <br />Regarding: COE Plan Review Comments (#E2402-085) <br />Please issue the following as Comments to the City of Everett Plan Review Comments: <br />1.) Ok, see revised E9.1 which now shows NEC 220.87 metered Actual Load. No change in load. <br />19515 North Creek Parkway, Suite 302, Bothell, WA 98011 <br />Phone:425-402-9400 Fax:425-402-9402 <br />D E^EOVE <br />FEB 22 2024 <br />CITY OF EVERETT <br />Permit Services <br />