My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000 TOWER ST 2024 BASE FILE 2025-10-24
>
Address Records
>
TOWER ST
>
2000
>
BASE FILE
>
2000 TOWER ST 2024 BASE FILE 2025-10-24
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2025 10:34:11 AM
Creation date
10/15/2025 3:26:03 PM
Metadata
Fields
Template:
Address Document
Street Name
TOWER ST
Street Number
2000
Tenant Name
BASE FILE
Year
2024
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NORTH <br />BASEMENT POWER FLOOR PLAN <br />SCALE: 1/4" = l'-O" <br />411)OA1 PSue & <br />1011 SW KLICKITAT WAY, STE. 208 <br />SEATTLE, WA 98134 1 (206) 631-8442 <br />https://_.oaips.00m <br />(E)500KVA TRANSFORMER <br />GENERAL NOTESCOMMUNITYCOLLEGE <br />1. PROJECT SCOPE OF WORK IS REPLACEMENT OF EXISTING 208V, 3-PHASE, 600 AMP <br />&EVERETT <br />DISTRIBUTION BOARD 'OLYMPUS'. EXISTING BOARD IS OLD WESTINGHOUSE CONSTRUCTION <br />C <br />AND 10K AIC RATED AND AT THE END OF USABLE LIFE. <br />J <br />2. PROJECT SCOPE NO CHANGE IN LOADS. <br />PF ENGINEERING <br />Consulting Electrical Engineers <br />19515 North Creek Parkway, Suite 302 <br />Bothell, Washington 98011 <br />Phone: 425-402-9400 Fax: 425402-9402 <br />FLAG NOTES <br />PROVIDE LABOR AND MATERIALS AS REQUIRED TO MAINTAIN EXISTING PANELBOARD <br />DURING NEW BOARD CONSTRUCTION TO MINIMIZE BUILDING DOWN —TIME. SEE FLAG <br />L s <br />y� <br />'U>� <br />NOTE 2, THIS SHEET, FOR ADDITIONAL INFORMATION. <br />PROVIDE LABOR AND MATERIALS AS REQUIRED TO INSTALL NEW HOUSE CLEANING <br />PAD AND NEW REPLACEMENT PANELBOARD ON OPPOSITE SIDE OF EXISTING. <br />0291�024� <br />VERIFY NEW LOCATION MAINTAINS NEC 36" CLEARANCE IN FRONT. COORDINATE <br />1 <br />ALTERNATE LOCATION WITH ELECTRICAL ENGINEER IF NEC CLEARANCE NOT <br />OBAL+ <br />AVAILABLE. <br />3�DURING <br />POWER CUT —OVER, PROVIDE JUNCTION BOX TIGHT TO CEILING TO <br />INTERCEPT EXISTING CONDUITS AND RE—ROUTE TO NEW BOARD. ALTERNATIVELY, <br />RE —PURPOSE EXISTING DISTRIBUTION BOARD AS JUNCTION BOX. <br />LJJ <br />Lf <br />0 <br />Q <br />W <br />� <br />0 <br />J <br />J <br />O <br />''LU^ <br />V <br />= <br />o <br />F_ <br />� <br />HW <br />Z� <br />C14 C14W <br />o <br />~ 00 <br />N <br />Z <br />0.- <br />Lug � <br />Q <br />Q <br />UW <br />QO LU <br />H <br />W <br />O <br />a~ j <br />W <br />a <br />WO w <br />�O <br />a <br />~ <br />U <br />w <br />wLLJ <br />V <br />o <br />> <br />> <br />W <br />W <br />Rev. #: Revision: Dale: <br />DRAWN BY: REVIEWED BY: <br />TN MSC <br />PROJECTSTATUS: <br />PERMIT DRAWINGS <br />ISSUE DATE: <br />02/09/2024 <br />SHEET SIZE: <br />ARCH D (24" x 36") <br />DRAWING SCALE: <br />As indicated (U.N.O.) <br />SHEET NO. / TITLE: <br />E2.1-O <br />BASEMENT POWER <br />FLOOR PLAN <br />PROJECT NUMBER: <br />
The URL can be used to link to this page
Your browser does not support the video tag.