My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY ZAP ENERGY 2025-11-04
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY ZAP ENERGY 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 11:54:35 AM
Creation date
10/17/2025 2:35:03 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POST-INSTALLED ANCHORS REPORT <br /> rerracon <br /> Report Number: M7231463.0002 r <br /> Service Date: 07/06/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 07/07/23 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Zap Energy Inc Century Seaway Opus Building <br /> Attn: Steve Zwaller 2300 Merrill Creek Parkway <br /> 506 2nd Ave Ste 1400 Everett, WA <br /> Seattle, WA 98104-2329 <br /> Project Number: M7231463 <br /> Permit No.: B2305-071 <br /> General Information <br /> Trico Companies requested Terracon be on site for observation of the mechanical anchors being installed by Trico <br /> Companies. <br /> The construction documents referenced for this observation include S1.1 dated 05/19/23. <br /> Anchor System Information <br /> The following anchor types were used during today's observation: <br /> Anchor No. Anchor Type ICC Report Anchor Anchor Required Torque Referenced <br /> Diameter Length <br /> 1 Hilti KB-TZ2 ESR-4266 1/2" 3-3/4" 40 foot-pounds Detail 1 on S1.1 <br /> Testing Equipment <br /> Test Equipment Description Calibration Date <br /> MTE-65662 12/13/22 <br /> Anchor Installation <br /> The above anchors were installed as follows: <br /> Anchor No. Locations Quantity Hole Depth & Embedment Spacing &Edge Status <br /> (tested/total) Diameter Distance <br /> 1 Control room 47/47 3-3/4"& 1/2" 3-1/4" 16"&3" Complies <br /> Holes were cleaned prior to installation using a vacuum, compressed air and brush. The ambient temperature <br /> during observation was 70°F. <br /> Results of observation(s) performed today were reported to Trico Companies. <br /> Compliance <br /> Based on our observations and testing, the post-installed anchors referenced above appear to be in general <br /> accordance with the project documents. <br /> Services: Special Inspections/ Materials Testing <br /> Mayes/Terracon Rep.: Ruvim Kravchuk <br /> Reported To: Trico Companies <br /> Contractor: Trico Companies <br /> Report Distribution: <br /> (1)Zap Energy Inc,Steve Zwaller (1)City of Everett WA,Permit Services <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc,Mike Reviewed By: <br /> Donna Pnllard Mattnx <br /> (1)Zap Energy Inc,Jim Werre (1)Zap Energy Inc,Nathan Wood <br /> Kevin Graham <br /> Office Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> DM018,04-29-22,Rev.5 Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.