My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY ZAP ENERGY 2025-11-04
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY ZAP ENERGY 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 11:54:35 AM
Creation date
10/17/2025 2:35:03 PM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHADOW I ISPEXTION &_ TESTINFG ILC (SIT) <br /> REPORT# <br /> INSPECTION REPORT 062023-MS <br /> PROJECT NAME DATE PAGE <br /> Zap Energy 6-20-2023 1 of 1 <br /> PROJECT LOCATION PO# BUILDING PERMIT NO. <br /> Opus Seaway, 2300 Merrill Creek Pkwy, Everett,WA. M7231463 <br /> CLIENT FABRICATION FACILITY <br /> Terracon Finnoe Design <br /> GENERAL CONTRACTOR/SUPERINTENDENT SUBCONTRACTORNOREMAN <br /> INSPECTION TYPE(S)/COVERAGE____________________ <br /> --------------------------------------------------------------------------------- <br /> Welding® N/A❑ NDT Testing® N/A❑ LOCATION OF INSPECTION:Finnoe Design,Spokane WA <br /> Observe® MT❑ UT❑ <br /> Perform® PT❑ VT® INSPECTION REQUESTED BY: Terracon/Mike Mayes <br /> Other:❑ <br /> CODES AND SPECIFICATIONS------------------ ---------- REFERENCE DRAWINGS AND/OR SPECIFICATIONS <br /> - - - - - - - - - ---------------------------------------------------------------------- <br /> AWS Shop Drawings: Approved Structural and Shop <br /> DIAE] DI.3❑ Drawings. <br /> DLIN Other® AISC341 <br /> INSPECTION DETAILS: <br /> Arrived on site at Finnoe Design as requested by Terracon to perform visual inspection and cursory shop <br /> audit. <br /> Upon arrival I met with Ryan and reviewed project details and status. Finnoe Design is AISC approved <br /> fabricator with two in house CWI and all welders are WABO certified. They currently have 3 crane <br /> beams completed for welding and are ready for paint. <br /> A visual inspection was performed on 1- B1005 and 2-B 1008.All welding,workmanship was found <br /> acceptable as AWS D1.1. <br /> Met with Finnoe Design and reviewed the details of the inspection. Finnoe has multiple members that <br /> require NDT. <br /> Unless otherwise noted, to the best of my knowledge all welding was found conforming the 2020 AWS <br /> D1.1, Clause 8, Table 8.1. <br /> Non-conforming items: <br /> INSPECTOR'S SIGNATURE PRINTED NAME <br /> Matthew Shatto <br /> V E DATE <br /> 06/27/2023 <br /> Shadow Inspection&Testing LLC(SIT) <br /> 910 N Woodlawn Rd. <br /> Spokane Valley WA.99216 Rev 0 12/22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.