Laserfiche WebLink
POST-INSTALLED ANCHORS REPORT <br /> rerracon <br /> Report Number: M7231463.0003 r <br /> Service Date: 07/06/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 07/07/23 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Zap Energy Inc Century Seaway Opus Building <br /> Attn: Steve Zwaller 2300 Merrill Creek Parkway <br /> 506 2nd Ave Ste 1400 Everett, WA <br /> Seattle, WA 98104-2329 <br /> Project Number: M7231463 <br /> Permit No.: B2305-071 <br /> General Information <br /> Trico Companies requested Terracon be on site for observation of the adhesive anchors being installed by Trico <br /> Companies . Results of observation(s) performed today were reported to Trico Companies. <br /> The construction documents referenced for this observation include S1.1 dated 05/19/23. <br /> Anchor System Information <br /> The following adhesive types were used during today's observation: <br /> Adhesive ICC Report Adhesive Lot No. Exp. Date Time Until Full Referenced <br /> No. Cure <br /> 1 ESR-2508 SET 3G 1000265247 04/26/24 24 hours Detail 1 on S1.1 <br /> Anchor Installation <br /> Anchor installation was observed as follows, utilizing the adhesive(s) noted above: <br /> Adhesive Time Location QuantityAnchor Length& Spacing &Edge Status <br /> No. Installed Size&Type Embedment Distance <br /> 1 1000 Control room 11 5/8"All-Thread 8"&3-1/8" 96"&NA Complies <br /> Holes were cleaned prior to installation using a vacuum, compressed air and brush. The ambient temperature <br /> during observation was 70°F. <br /> Compliance <br /> Based on our observations and testing, the post-installed anchors referenced above appear to be in general <br /> accordance with the project documents. <br /> Services: Special Inspections/ Materials Testing <br /> Mayes/Terracon Rep.: Ruvim Kravchuk <br /> Reported To: Trico Companies <br /> Contractor: Trico Companies <br /> Report Distribution: <br /> (1)Zap Energy Inc,Steve Zwaller (1)City of Everett WA,Permit Services <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc,Mike Reviewed By: <br /> Donna Pnllard Mattnx <br /> (1)Zap Energy Inc,Jim Werre (1)Zap Energy Inc,Nathan Wood <br /> Kevin Graham <br /> Office Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> DM018,04-29-22,Rev.5 Page 1 of 1 <br />