Laserfiche WebLink
FABRICATION SHOP OBSERVATION REPORT Wrerracon <br /> Report Number: M7231463.0001 <br /> Service Date: 06/20/23 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 07/03/23 Lynnwood,WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Zap Energy Inc Century Seaway Opus Building <br /> Attn: Steve Zwaller 2300 Merrill Creek Parkway <br /> 506 2nd Ave Ste 1400 Everett,WA <br /> Seattle,WA 98104-2329 <br /> Project Number: M7231463 <br /> Permit No.: B2305-071 <br /> GENERAL INFORMATION <br /> Please find attached the Inspection Report by Mat Shatto with SIT for work performed on 06/20/23 at Finnoe <br /> Design in Spokane, WA, for the above noted project. <br /> Services: Special Inspections/Materials Testing <br /> Mayes/Terracon Rep.: Matt Shatto <br /> Reported To: Trico Companies <br /> Contractor: Trico Companies <br /> Report Distribution: ' <br /> (1)Zap Energy Inc,Steve Zwaller (1)City of Everett WA,Permit Services <br /> (1)Mayes Testing Engineers,Inc, (1)Mayes Testing Engineers,Inc, Reviewed By: A/� <br /> Donna Pollard Mike Mattox <br /> (1)Zap Energy Inc,Jim Werre (1)Zap Energy Inc,Nathan Wood Kevin Graham <br /> Office Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client <br /> indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to <br /> the actual samples tested at the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> CT0001,10-16-13,Rev.10 Page 1 of 1 <br />