My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1606 SE EVERETT MALL WAY 2025-11-04
>
Address Records
>
SE EVERETT MALL WAY
>
1606
>
1606 SE EVERETT MALL WAY 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 8:01:38 AM
Creation date
10/17/2025 3:25:18 PM
Metadata
Fields
Template:
Address Document
Street Name
SE EVERETT MALL WAY
Street Number
1606
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• The new 5/8" diameter sill plate anchors were spaced approximately at 40" o.c. <br /> with 3"xY washers. <br /> • The new exterior sheathing consisted of 7/16" thick OSB with boundary nailing <br /> fasteners approximately @ 4" o.c. or less <br /> • Drilled holes in the wood were observed to be in compliance with the IBC. The <br /> holes were more than 5/8" from the edge of the studs and the diameter of the <br /> hole is less than 40% of the depth. <br /> • The temporary shoring wall was observed to be still erected. This wall can be <br /> removed. <br /> The design repair drawings have been revised to reflect that the west wall was in good <br /> condition and did not require repairs. The repaired wood framing was observed to be in <br /> compliance with structural drawings as produced by Rimkus <br /> This report was prepared for the exclusive use of Blusky Restoration Contractors, L.L.C. <br /> and is not intended for any other purpose. Our report is based on the information <br /> available to us at this time. The opinions and conclusions herein are based on sufficient <br /> facts or data; they are the product of our analysis utilizing reliable, generally accepted <br /> principles and methods in our applicable professional field; and they reflect a reliable <br /> application of these principles and methods to the facts of this matter. Should additional <br /> information become available, we reserve the right to determine the impact, if any, the <br /> new information may have on our opinions and conclusions and to revise our opinions <br /> and conclusions if necessary and warranted. This report was reviewed by Joey McCloud, <br /> Practice Leader. <br /> Thank you for allowing us to provide this service. If you have any questions or need <br /> additional assistance, please call. <br /> Digitally signed by: �1�1 CKJ"oos <br /> Sincerely, DERECK J HODSO °� °' w asy� oti <br /> Rimkus �� <br /> Date: 2025.06.24 13: �� z <br /> 56:06 -07'00' �51 <br /> �'�'p 145SIERti9 c�S,vC- <br /> �S' tiNGS� <br /> Dereck Hodson, PE S/ANAL <br /> Engineering Number 54585 <br /> Senior Consultant <br /> June 24, 2025 1 Rimkus Matter No. 100292668 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.