Laserfiche WebLink
6 <br />Milestone <br />(Pre-Pour) <br />Locate request 48 hours prior to <br />trenching and Digging <br />ANM Electric, Inc <br />All work required <br />under Milestone (Pre- <br />Pour) must be <br />completed no later <br />than ten (10) calendar <br />days after Work <br />Restart Date <br />Utilities Notifications & Marks ANM Electric, Inc <br />Begin trenching per project <br />specifications - Lower Parking <br />Area <br />ANM Electric, Inc. <br />Dig holes for light pole bases <br />(including safety signage) - Lower <br />Parking Area <br />ANM Electric, Inc <br />Begin trenching per project <br />specifications - Upper Parking <br />Area. <br />ANM Electric, Inc <br />Trenching and Dig holes for light <br />pole bases (including safety <br />signage) <br />Upper Parking Arae <br />ANM Electric, Inc <br />Electrical laydowns of conduit in <br />trenches - <br />Assemble rebar cages and install <br />sonotubes - Lower Parking area <br />Resound Energy, <br />ANM Electric, Inc <br />Electrical laydowns of conduit in <br />trenches and inspection request, <br />Assemble rebar cages, install <br />sonotubes and Request for <br />inspection <br />Resound Energy <br />ANM Electric, Inc <br />Inspection Day - ANM Electric, <br />Resound Energy & <br />Boadus <br />