Boadus Pride LLC 10/22/2025 Change Order 2
>
Contracts
>
Agreement
>
Other Agreements
>
Boadus Pride LLC 10/22/2025 Change Order 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/22/2025 10:35:41 AM
Creation date
10/22/2025 10:35:26 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Boadus Pride LLC
Approval Date
10/22/2025
End Date
12/31/2025
Department
Finance
Department Project Manager
Theresa Bauccio-Teschlog
Subject / Project Title
Senator Henry M. Jackson Park Lighting Improvement Project
Amendment/Change Order
Change Order
Amendment/Change Order Number
2
Tracking Number
0004731
Total Compensation
$129,022.60
Contract Type
Agreement
Contract Subtype
Other Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
7 <br />Milestone <br />(Pour) <br />Concrete delivery, Slump test & <br />Pour concrete for the 6 light pole <br />bases and completed backfill and <br />grading of trench areas and poles <br />bases <br /> <br />ANM Electric, Inc <br />Terracon (slump test) <br />All work required <br />under Milestone (Pour) <br />must be completed no <br />later than fourteen (14) <br />calendar days after <br />Work Restart Date <br />Milestone <br />(Electrical <br />Installation) <br />ESD for the 2x COO RSWPD5-CM- <br />3-BZ installation Resound Energy, All work required <br />under Milestone <br />(Electrical Installation) <br />must be completed no <br />later than twenty-one- <br />(21) calendar days after <br />Work Restart Date <br />H12S-LD4-30W-35-OPL-WH-120- <br />EDC1-EL5W installation Resound Energy <br />BRT6-A4-740-U-T5-42-BZ-SM2 <br />installation Resound Energy <br />Milestone <br />(Pole Setting) <br />Setting of poles and pole head <br />connections to power up new <br />pole lights, in upper and lower <br />parking areas <br /> <br />Resound Energy <br />All work required <br />under Milestone (Pole <br />Setting) must be <br />completed no later <br />than forty seven (47) <br />calendar days after <br />Work Restart Date. <br />(This includes <br />allowance for 28- <br />calendar day concrete <br />cure period and 5 <br />calendar days for pole <br />setting and install after <br />cure) <br />Request Project final inspection <br />Boadus/Resound <br />Energy <br />Milestone <br />(Final <br />Inspection) <br />Final inspection(s) will be <br />conducted depending on the <br />inspector's availability <br />Project must pass final <br />inspection(s) <br />Resound Energy & <br />Boadus <br />All work required <br />under Milestone (Final <br />Inspection) must be <br />completed no later <br />than fifty (50) calendar <br />days after Work <br />Restart Date. <br />