Laserfiche WebLink
I <br /> E V E R E T T Routing For Public WO. Ks Permit Review <br /> WAS H I N GTO N From Public Works Reviewer I Permit Services <br /> Routed Date: 5/9/2019 <br /> Permit#: PW1905-036 <br /> PROJECT ADDRESS: 5109 SEAHURST DUE: 6/5/2019 <br /> DESCRIPTION OF WORK: SITE WORK FOR 2 LOT SP <br /> 1ST REVIEW <br /> PLANNING REFERENCE#'s (if applicable): `-- ---`- - -----"-._.._ ---- <br /> PRE-APP MEETING #: PREAPP 18-037 <br /> LAND USE PROJECT#: SUB 18-006/REVII 18-025 <br /> PUBLIC WORKS REVIEWER: THAD NEWPORT� <br /> REQUEST: Please review the attached material for your area of concern and return any comments <br /> and/or redlines to the Public Works Reviewer listed above. <br /> ROUTED TO: <br /> ❑ Stormwater/Drainage: Jane Zimmerman/Amie Roshak/ Erik Emerson-Please fill out NPDES Tab in TRAKiT <br /> 11 Traffi ichael Bric John Wisdom/ Corey Hert/Steve Sawyer/Tim Miller <br /> Water: im Spoone Tim Markham/Rich Hefti/Jennifer Bailey <br /> 19 Sewe . rian o /Dave Voigt/Amie Roshak/Mark Sadler/Grant Moen <br /> 9 Planning: Teresa Weldon/Grace Pollard/ Kelsey Heyd / �yges / Dave Tyler/Steve Ingalsbe <br /> ❑ Building: Drew Martin/James Bronder/Jeff Heilman/Tony Lee <br /> [9- Fir urns Bro /Steve Goforth/Jeff Alford/Other <br /> ❑ Other Department: <br /> ROUTED MATERIALS: <br /> 0. Plans ❑ Original City Comment Letter <br /> ❑ Traffic Control Plan ❑ Original City Plan Markups <br /> ❑ Drainage Report ❑ Original City Drainage Report Markups <br /> ❑ Geotechnical Report ❑ SEPA Determination (for reference) <br /> ❑ Wetland Report ❑ Preliminary Short Plat Approval (for reference) <br /> ❑ Arborist Report ❑ Other: <br /> COMMENTS FROM REVIEWER: (Please make comments below and/or redlines on plans) <br /> STATUS: <br /> ❑ Approved <br /> ❑ Approved as Noted/Modified <br /> ❑ Revisions Required, See Comments <br /> ❑ Review Not Required <br /> COMMENTS: <br /> REVISED 2(22,2019 <br />