Laserfiche WebLink
SECTION III: SITE DEVELOPMENT PLAN W/ON-SITE <br /> STORMWATER MANAGEMENT <br /> The site area is 0.30 Acres. The proposal is to subdivide the existing lot into two <br /> and to constrict a single family home on Lot-2 along with associated utilities. The existing <br /> home will remain on Lot-1. The access to the site will be from the Seahurst Ave. <br /> Minimum requirements 1-5 apply to the project because the project Lot's effective <br /> impervious area is 4,800 SF which is less than 5,000 SF. Tile developed site drainage will <br /> be discharged towards an existing drainage system along the Seahurst Ave to continue its <br /> natural drainage path. <br /> Insight Engineering Co. - Stormwater Site Plan 07/24/19 <br /> - 12- <br />