Laserfiche WebLink
Post Indicator Valve (PIV): <br /> PASS FAIL N/A <br /> 23. Accessible- Both Remote Post Indicator Valves and Wall Post Indicator Valves ❑ ❑ ❑ <br /> shall be easily accessible, and the Open/Closed indicator shall be visible at all <br /> times. <br /> 24. Cutable Lock-The PIV shall be provided with a cutable padlock. ❑ ❑ ❑ <br /> 25. Clear Space-A clear working space not less than 36 inches in width, 36 inches in ❑ ❑ ❑ <br /> depth and 78 inches in height shall be provided. <br /> System in Full Operation: <br /> PASS FAIL N/A <br /> 26. Systems Normal - Ensure all systems are normal ❑ ❑ ❑ <br /> 27. Alarm Off Test- Ensure the Fire Alarm is off of test with the monitoring company. ❑ ❑ ❑ <br /> 28. NFPA 13 Report-The installer shall complete and sign the NFPA 13 Contractor's ❑ ❑ ❑ <br /> Material and Test Certificate for Aboveground Piping prior to final approval of the <br /> system. (If the building is also equipped with a standpipe system the installer shall <br /> also complete and sign the NFPA 14 Contractor's Material and Test Certificate for <br /> Aboveground Piping prior to final approval of the system.) <br /> 29. Keys for Knox Box- Keys for the Fire Sprinkler Room and PIV(s) shall be provided ❑ ❑ ❑ <br /> so they may be placed into the Knox Box. <br /> Fire Marshal's Office 425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-6 4.13.2020 1 Page 11 <br />