My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 1680
>
Ordinances
>
Ordinance 1680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2025 3:01:44 PM
Creation date
10/24/2025 3:01:40 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1680
Date
8/24/1915
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
♦ 7 �. 1 <br /> f • <br /> . <br /> for securing and developing such water power, and for the con— <br /> struction of a plant to generate electric current and transmit <br /> the same to the city of Everett for the use of said city and its <br /> inhabitants for the purposes ccT light, heat, power and fuel, and <br /> to prepare plans for securing the funds necessary to acquire and <br /> construct such electric system, if the same should be found to be <br /> practicable, and submit said plans to the voters of the city of <br /> Everett. <br /> Adopted at the Special Municipal Election held August 24, 1915. <br />
The URL can be used to link to this page
Your browser does not support the video tag.