My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Brown and Caldwell, Inc. 10/28/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Brown and Caldwell, Inc. 10/28/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2025 10:51:32 AM
Creation date
10/29/2025 10:49:48 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Brown and Caldwell, Inc.
Approval Date
10/28/2025
Council Approval Date
10/22/2025
End Date
12/31/2028
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
WPCF Headworks Replacement - Design
Tracking Number
0004998
Total Compensation
$8,998,917.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
WPCF Headworks Replacement Project Scope of Work <br />52 <br /> <br />Task 505 QAQC <br />Activities/Approach <br /> Implement the QMP for review of project calculations and work products for the site <br />preparation package preliminary and final design documents. Based on the QMP, provide <br />appropriate calculation and deliverable QA/QC reviews by senior staff members in-house. <br /> Conduct independent calculations and deliverable review by experienced senior engineers. <br />Responses to internal reviews and City comments will be tracked and maintained in the <br />project file. <br /> Document QA/QC activities, including signoff from reviewers, review comments, and <br />responses. <br />Task Assumptions <br /> Internal QA/QC review will be completed under this phase. Comments will be addressed by <br />the technical team during the associated design stage under Tasks 501 and 502. <br />City Responsibilities <br /> Provide a coordinated and consolidated collection of review comments and resolution of any <br />conflicting comments from the City reviewers prior to returning to the design team. <br /> Participate in the review process by reviewing task deliverables. <br />Meetings <br /> None <br />Work Products <br /> Collection and storage of QA/QC documentation as required by the QMP. <br />Deliverables <br /> <br />Excel worksheet. <br />Phases 600, 650, 700, 710 Preliminary and Detailed Design of <br />Headworks Package <br />The headworks design will be completed in four phases; <br /> Phase 600 Preliminary Design <br /> Phase 650 Intermediate Design <br /> Phase 700 Final Design <br /> Phase 710 Bid Documents <br />The key outcomes for these phases will be the following: <br /> Prepare bid documents for complete construction and commissioning of the WPCF <br />headworks facility as documented in the Basis of Design Report. <br /> Coordinate the execution of the detailed design in concert with the site preparation package. <br /> Lead the project design team to meet schedule milestones.
The URL can be used to link to this page
Your browser does not support the video tag.