WPCF Headworks Replacement Project Scope of Work <br />54 <br /> <br />Phase 650 Intermediate Design <br />Objective: Obtain approval from the City on the complete arrangement of the proposed headworks <br />design. This is considered the design scope freeze point. Civil, structural, architectural, and process <br />mechanical models are largely complete and all major design decisions have been reached and <br />approved. Electrical, instrumentation, and building mechanical models have been progressed. Major <br />construction documents, drawings, and specifications have been progressed. This phase includes <br />addressing preliminary design comments provided by the City, GC/CM, and other stakeholders. A <br />revised cost estimate and construction schedule will be provided under Phase 350. <br />Following completion of the intermediate design phase, the project team will reassess the scope and <br />budget to reflect the actual headworks facility requirements. At that time, an amendment will be <br />issued to incorporate revised scope elements based on the confirmed design criteria and facility <br />configuration, adjust the project budget to align with the updated scope, and identify and formally <br />include any work previously considered out-of-scope due to initial design uncertainties. <br />The initial project contract scope of work ends at Phase 650. Subsequent design phases 700 <br /> <br />Phase 700 Final Design <br />Phase 700 Scope of work is not included in the initial design contract. This work will be added <br />through request. <br />Objective: The final design phase advances the intermediate design package to a complete set of <br />engineering plans and technical specifications. The final design reflects a comprehensive and <br />detailed representation of the headworks facility and will serve as the basis for developing the <br />GC/CM GMP and a final constructability review for development of the bid documents. The final <br />Design documents will be submitted to the City, permitting agency(ies), and other stakeholders for <br />review and comment. A Class 1 cost estimate and construction schedule will be developed under <br />Phase 350. Regulatory coordination will be completed under Phase 100 Task 130. <br />Phase 710 Bid Documents <br />Phase 710 Scope of work is not included in the initial design contract. This work will be added <br />through request. <br />Objective: The bid set phase advances the final design documents to bid ready status. This phase <br />includes updating the final design based on comments from permitting agency(ies), City, GC/CM, <br />and other stakeholders. This phase includes a final QAQC step to check for project completion. <br />The following table summarizes the discipline specific tasks included in each of the preliminary <br />through detailed design phases. Structural design is scoped under Phase 300 Task 310. The <br />narrative sections below the table summarize the general task specific activities. <br />