My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Everon LLC 10/30/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Everon LLC 10/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 10:13:26 AM
Creation date
11/3/2025 10:12:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Everon LLC
Approval Date
10/30/2025
End Date
2/1/2026
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
Everett Municipal Court – Judges Exit Door
Tracking Number
0004999
Total Compensation
$38,436.88
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Qty Manufacturer Description <br />1 Honeywell Video <br />Systems <br />Pw7000 Intelligent Controller Max 64 Doors Wsub Panels <br />2 Honeywell Video <br />Systems <br />PW7000 Dual Reader Board <br />6 HID Signo40, Wall mount, 13.56mHz &125kHz, OSDP/Wiegand <br />500 WINDY CITY <br />WIRE <br />14/2 Plenum fire wire 500 FT <br />1,000 WINDY CITY <br />WIRE <br />4 Elem Comp Cable CMP Grn Jkt Composite Access <br />Control Wire <br />1 Honeywell Access 32 reader lic add-on <br />1 LifeSafety Power 150W 12&24 8LK 8AUX PL E8H <br />3 G.R.I.3/4IN MAG SWITCH/RECESSED <br />3 POWER SONIC BATTERY 12V-12AH SEALED LEAD ACID WITH F2 <br />TERMINAL (#86560) <br />1,000 Honeywell Cable 22/6 STR OAS CMP 1M <br />Summary of Charges <br />Equipment & Installation Total $34,974.41 <br />Estimated Taxes $3,462.47 <br />Monthly Fee $0.00 <br />Scope Of Work <br />Everon will provide: <br />•Design Engineering <br />•Equipment, Freight, and Installation (see below Everon provided equipment) <br />•Programming, Testing and Commissioning <br />•Project Close-out <br />•Equipment Warranty (Everon provided equipment) <br />•Work to be performed <br />•7AM – 4:30PM Monday – Friday <br />In the Equipment Schedule below, we have noted the locations in your facility where work will be done and equipment will be installed. <br />*Revit RVT format also available. Additional costs for labor and coordination will apply. <br />**Everon requires AutoCAD ‘DWG’ background files to produce the Security Design Drawing Package. We are able to convert other file <br />formats including Adobe ‘PDF’ files, but understand that the conversion of such files may take additional time and expense. <br />Everon To Provide: Provide and Install (3) Access Controlled doors. Subcontractor to Provide locks, change existing Crash Bars (REX and <br />contacts) Readers on both sides of doors. Crash bars have 30 second delay, Access Control will <br />allow 30 second delay exception for Judges. Run Composite wire to Head-end location, (1) power supply to power locks, connection to fire <br />system to drop locks on fire is 30 ft. away from head-end. <br />PRICING: If Everon’s cost of products sold under this agreement is increased by: (a) any government action, executive order, tariff, duty, tax, or <br />other government-imposed fee; (b) foreign currency exchange variation; and/or (c) other increased cost of third-party supplies, labor, and/or <br />Products, then <br />Everon shall have the right to increase pricing in the amount equal to the increased cost of products. If applicable, Everon shall have an <br />immediate right to a change order for any such cost and price increase. The timing and effectiveness of any such price increase is separate <br />from and in addition to <br />any changes to pricing that are affected by any other provisions in this Agreement
The URL can be used to link to this page
Your browser does not support the video tag.