Client to provide:
<br />•Access to work areas during normal business hours
<br />•Network connectivity, open network port, POE ports, IP schema
<br />•120VAC connection to new power supply
<br />•Fire-treated plywood backboard and wall space for new power supply
<br />•Card credentials
<br />•Remote access to existing Pro-Watch software for programming
<br />General Notes and Exclusions
<br />The following details are general notes and exclusions based on the project summary.
<br />1.Equipment changes or location changes due to CUSTOMER request, or if necessary, for the system to operate properly,
<br />will be considered a change order from the original scope of work and billed accordingly at the labor and material rates
<br />already in effect on this contract.
<br />2.All installation labor, final connections, and testing under this proposal shall be performed during normal business hours
<br />and normal workdays. Normal business hours are Monday through Friday 8:00 AM to 5:00 PM. If work is required to be
<br />completed outside of normal business hours, a change order will be presented to the customer’s representative.
<br />3.All 110 VAC Class 1 electrical power provisions and terminations, at required locations, to be provided by others, unless
<br />specified as provided by EverOn in this scope of work.
<br />4.Cable path including Cable tray, raceway, conduit, pull boxes, back boxes, and pull strings are. to be provided by others.
<br />Cable will be installed in existing data cable trays or exposed and be suspended to building structure. We assume that our
<br />technicians will be able to utilize established cable paths/trays. If required, cable trays, ducts, coring, sleeves, and fire
<br />sealing provided by others.
<br />5.When conduit and/or wire mold may be used to route the system cable in exposed areas only. Painting is not included.
<br />6.Locating or identifying existing buried infrastructure or raceway is excluded.
<br />7.Electrified door hardware, electric locks, door closers, and associated door hardware are excluded, unless specifically
<br />included in our scope of work and /or equipment list.
<br />8.Cores, cylinders, and keys are excluded.
<br />9.Connection to building/facility fire alarm for the purpose of releasing locking hardware, handicapped and/or revolving exit
<br />doors excluded in this proposal, unless indicated in scope of work section
<br />10.Pre-manufactured frames and doors, pre-drilled, prepped for security devices i.e., transfer hinges, surface mounted DPS,
<br />REX, frame/door mounted electronic strikes, magnetic locks, etc by others.
<br />11.Secure onsite indoor storage location for EverOn materials, if required, for scope parts/pieces, cable, toolboxes, tools,
<br />ladders, carts, and miscellaneous equipment to be provided by others.
<br />12.PCs, servers, additional workstations, clients, or other required network equipment, that are to be provided by others, must
<br />meet the security software manufacturer’s minimum configuration standards.
<br />13.Network switches, routers, network and telephone connections, jacks, IP addresses and pathways onto the corporate
<br />network are not included in this Proposal. EverOn will coordinate these items with client and/or other project stakeholders.
<br />14.Interconnection between EverOn provided equipment/networks and the customer’s network shall be by Customer unless
<br />specified in the scope document.
<br />15.All Operating System, SQL, and other enterprise software to be provided by others unless noted specifically this
<br />document.
<br />16.Additional software licensing or system upgrades (Software Licensing) are excluded unless noted in scope of work.
<br />17.Antivirus subscriptions or installation, firewall configuration and installation, software maintenance or updates, operating
<br />system maintenance or updates, database maintenance, updates or backups, or network/software hot fixes or patches are
<br />excluded unless noted in scope of work.
<br />18.All back-up power and UPS units / systems to be provided by others, unless specifically stated in our scope of work.
<br />19.All consoles, furniture, and equipment racks to be provided by others unless noted otherwise.
<br />20.Client will allocate dedicated wall space for EverOn to mount our equipment such as control panels, processor panels, low
<br />voltage power supplies, communications equipment. Typically, this is a contiguous wall space of at least four (4) feet wide
<br />and floor-to-ceiling height. Plywood mounted / painted at this location to be provided by others.
|