My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Everon LLC 10/30/2025
>
Contracts
>
Agreement
>
Other Procurement Agreements
>
Everon LLC 10/30/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/3/2025 10:13:26 AM
Creation date
11/3/2025 10:12:52 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Everon LLC
Approval Date
10/30/2025
End Date
2/1/2026
Department
Finance
Department Project Manager
Bert Cueva
Subject / Project Title
Everett Municipal Court – Judges Exit Door
Tracking Number
0004999
Total Compensation
$38,436.88
Contract Type
Agreement
Contract Subtype
Other Procurement Agreements
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
the maintenance, operation, non-operation, actuation, non-actuation or needless or erroneous actuation of the existing <br />equipment; that service may be terminated by Everon in the event the existing equipment is not in good working operating <br />condition and Everon shall not be liable for any damage of subject to any penalty as a result of such termination. Any repairs to <br />or replacement of existing equipment at the time of reconnection will be charged to the customer on a time and materials basis at <br />the prevailing rates. <br />CUSTOMER shall provide all conduit and raceways with pull strings. All conduits/raceways will have pull boxes installed <br />maximum 150’ apart, and conduits/raceways will terminate in an appropriate electrical box. <br />CUSTOMER is responsible for any patching, painting, replacement of ceiling tiles, and wall coverings. <br />Proposal Excludes: <br />All Penetrations and Sleeves <br />Area of Refuge/Rescue <br />Conduit, raceway, wire supports and boxes <br />HVAC devices or cabling <br />120V connections <br />Smoke Dampers <br />Fire Proofing, cutting, patching or painting <br />Demolition/Underground Work <br />Fire Printer · UPS <br />Vesda, Door Holders, & Smoke Control <br />After Hours, Weekend, or Holiday Labor <br />Cable Trays & Knox Boxes <br />Any additional work not listed above <br />Proposal Includes: <br />Fire alarm includes (1) permit ONLY additional/revised permitting requires a change order. <br />Fire alarm price is subject to change per sprinkler system. <br />Engineering, including project drawings, equipment submittals, as-built drawings and Operation & Maintenance manuals. <br />Installation of wiring, devices, specialty back-boxes and panels during normal business hours. <br />One-year warranty on all components, material and installation. <br />(Includes on-site training only; No Travel is included; Training provided by Everon Staff) <br />Standard Freight and Delivery. <br />Everon is not responsible for any items or details not shown that may affect the system concept or design. Any changes in design <br />concept, any additional devices required by State or Local Code, the Authority Having Jurisdiction or Fire Marshall will affect this <br />price accordingly. AutoCAD Background Drawings shall be provided at no additional cost to Everon. There is an extra charge for <br />after hours or weekend labor and any additional devices not shown. Additional devices and labor will be provided upon receipt of <br />an approved change order. <br />CUSTOMER agrees that at this time, the availability and price of certain Materials and Commodities (“Material”) worldwide, <br />including but not limited to, chip components, oil, gasoline, steel, aluminum and plastic products can be extremely volatile. <br />Everon guarantees the pricing in this proposal for no more than the next thirty (30) days from the date of this Proposal. Customer <br />further agrees that should the cost to Everon of the Materials required for this Project rise after the thirty (30) day period, Everon <br />reserves the right to reasonably reassess the cost differential and add any increase to the above pricing. <br />CUSTOMER agrees that at this time, the availability and price of certain Materials and Commodities (“Material”) worldwide,
The URL can be used to link to this page
Your browser does not support the video tag.