My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY 2025 ZAP ENERGY 2025-11-04
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY 2025 ZAP ENERGY 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 11:54:35 AM
Creation date
11/4/2025 11:53:12 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Year
2025
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> E V E R E T T Permit Services <br /> WASHINGTON <br /> February 27, 2025 <br /> Applicant: Lyndsi Mortenson I Email: permits@hermanson.com <br /> Owner: RAINER PROPERTIES LLC I Email: permits@hermanson.com <br /> Site Address: 2300 MERRILL CREEK PKWY <br /> Permit Number: M2501-088 <br /> Subject: 15T Review—Building Comment Letter <br /> Dear Lyndsi Mortenson, <br /> The proposed project has been reviewed for compliance with the provisions of the building codes adopted <br /> and amended by the state of Washington and the City of Everett.The following comments need to be <br /> addressed before a permit can be issued. For resubmittal, follow the permit document upload standards & <br /> instructions (PDF)to prepare and upload your resubmittal package. Once uploaded,you must send an email <br /> with your completed Transmittal Sheet (PDF)to PermitServices@everettwa.gov to ensure proper routing <br /> through the system, as the online permitting portal does not notify staff when documents are uploaded. <br /> Failure to do so will unintentionally delay your permit review. <br /> Required Resubmittal Items—Outlined below with required naming convention: <br /> a. 1stReview_ResponseLetter_MM.DD.YYYY- Itemized letter addressing the comments provided <br /> below in this correction letter. <br /> b. 1stReview_BuildingPlans_MM.DD.YYYY-Complete set of revised construction drawings. <br /> c. 1stReview_StructuralCalculations_MM.DD.YYYY-Complete set of supplemental structural <br /> calculations. <br /> Note: See Step 3: Permit Review for important information about this stage of the permitting process <br /> and to follow along with reviewer statuses. <br /> General Comments: <br /> The applicable codes used in this review include but are not limited to: Everett Municipal Code(EMC), 2021 <br /> International Mechanical Code(IMC), 2021 International Existing Building Code(IEBC), 2021 Washington <br /> State Commercial Energy Code(WSEC-Commercial), Washington Accessibility Code 2017. For a full list of <br /> applicable codes adopted by the City of Everett, please see the Construction Codes (PDF). <br /> 1. FUME HOOD <br /> a. Please contact the Puget Sound Clean Air Agency for the fume hood installation and <br /> operations, and comply with their requirements. <br /> b. EF-1 does not appears to have the clearances required per IMC 501.3.1. Please revise, <br /> including wind data indicating "direction of the exhaust discharge" and clearance to ERV <br /> OSA intake. <br /> c. Please provide a narrative describing how the fume hood complies with dilution <br /> requirements of IMC 510.3 and 510.5. <br /> d. Please provide notes that a ductwork fire suppression system will be provided. See IMC <br /> 510.7. <br /> e. Please review and address "Explosion Relief' provisions of IMC 510.8.3. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.