Laserfiche WebLink
REPORT SUMMARY <br /> 41999 <br /> -MMMW <br /> 1., <br /> APPW <br /> ZAP ENERGY <br /> Project Name: Zap Energy Lithium <br /> Address: 2300 Merrill Creek Parkway Everett, WA 98203 <br /> Velocity Job#: 70-25-28392 <br /> This is to certify that Velocity Building Technical Services, LLP has tested airflow on the system <br /> described herein to their best possible performance capabilities. The data presented is a record <br /> of measurements and adjustments at the time the work was performed. This testing was <br /> performed in accordance with the TABB Procedural Guide (2003) and other industry standards. <br /> This work is warrantied for and expires ninety days from the report date unless otherwise <br /> stated in contract documents specific to this project. <br /> Submitted and certified by: Darrin Williams, TABB Supervisor <br /> Date: 6.26.2025 <br /> `ca`\oaa\Ge rt ifi�at ode <br /> � d <br /> Damn M Williams <br /> TABB S.—is. <br /> Nod Valid Unlass Signed <br /> -)_,I).-- <br /> E.,—D-12 TESTING,ADJUSTING AND BALANCING BUREAU <br /> c <br /> COrtifiedContca" THE PROFESSIONAL'S CHOICE" <br /> vq!o!y <br /> •i 98032 • •• velocitybts.corn <br />