My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2300 MERRILL CREEK PKY 2025 ZAP ENERGY 2025-11-04
>
Address Records
>
MERRILL CREEK PKY
>
2300
>
ZAP ENERGY
>
2300 MERRILL CREEK PKY 2025 ZAP ENERGY 2025-11-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/4/2025 11:54:35 AM
Creation date
11/4/2025 11:53:12 AM
Metadata
Fields
Template:
Address Document
Street Name
MERRILL CREEK PKY
Street Number
2300
Tenant Name
ZAP ENERGY
Year
2025
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REPORT SUMMARY <br /> 1) General Information <br /> a) This report is based on actual field readings taken during operation unless otherwise noted. <br /> Work was completed on: 6.26.2025 <br /> b) Equipment is inspected for proper and safe operation unless noted in this summary or the <br /> associated data contain herein <br /> c) Work requiring adjustments will be performed to+/-10%of the design value unless other <br /> specifications require increased/decreased tolerances and approval by the Engineer of <br /> Record (EOR) or Authority Having Jurisdiction (AHJ). Flow rates were measured with <br /> calibrated instruments and are listed on the tool summary <br /> d) All suggestions to further improve performance or function need to be fully vetted and <br /> verified by all interested parties (i.e. Engineer, Owner,Tenant, Contractor) <br /> e) Deficiencies noted throughout this report are the responsibility of the parties having an <br /> interest in them and are not to be corrected by the TAB team unless instructed in the <br /> contract documents. Notes are added for clarification as applicable <br /> f) Design information is drawn from various sources to include, but not limited to: Drawings, <br /> specifications, user manuals, shop drawings, submittals, service history, legacy documents, <br /> and oral & photographic information. Additionally, unspecified values may be field <br /> determined as required in the absence of engineered values, based on current best <br /> practices <br /> 2) Scope of the Project (Overview) <br /> a) Balance 1 new Greenheck exhaust fan that serves a fume hood in the machine shop <br /> b) Balance 1 new Mitsubishi fan coil unit that serves the machine shop area <br /> c) Balance 1 new Mitsubishi energy recovery ventilator system that serves the machine shop <br /> 3) System Description <br /> a) Upblast type exhaust fan that is connected to an owner provided fume hood as well as 2 <br /> additional inlets at the ceiling on either side of the fume hood. Welded stainless steel duct <br /> system. Controlled by a switch located on the fume hood face. <br /> b) Split system fan coil unit that serves the machine shop area as is controlled by a stand alone <br /> thermostat located within space. <br /> c) Plate exchanger style energy recovery ventilator system that conditions the fresh air being <br /> introduced to the machine shop space. <br /> 4) Findings <br /> a) Units were balanced to design specifications. <br /> b) Exhaust fan system operates at full speed to maximize exhaust airflow from the fume hood <br /> which was approved by the mechanical engineer. <br /> velocity 440 .: 98032 <br />
The URL can be used to link to this page
Your browser does not support the video tag.