Laserfiche WebLink
42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 <br /> AF <br /> AE <br /> AD <br /> AC �, G <br /> oa <br /> NIP <br /> AB 1 JW y ORop 102 ROpYGQlN®�` Qy\ <br /> Q 1RP <br /> 101 j4 50 2�GRO <br /> 49 1 <br /> AA <br /> ��aO\�G <br /> \ JP��y V' <br /> Z <br /> e FJ <br /> Y a0 <br /> Pam' <br /> X <br /> 4 <br /> yt�aDy QJP\�-py <br /> R <br /> V Q� <br /> U ` <br /> 104 <br /> T � :24° <br /> yj��NOy QJ� y d, <br /> P <br /> o <br /> �Jr <br /> R <br /> PG 47 slC <br /> Q - <br /> 03� 48 <br /> F��Z 45 Op1,G <br /> O PG. 44 �Q y�O�Oy QJ y <br /> �Pa'R <br /> N s <br /> ppa <br /> 40 F\E\- <br /> Q�' \N <br /> (i\SEA <br /> 4 p O\aG <br /> 1 y.0P\"O <br /> K <br /> v'y <br /> J <br /> 10 y�EEoo� <br /> G\J\�E�G�Eby <br /> yEo\J��yot� MANUAL WET CLASS I STANDPIPE <br /> g �y0 <br /> H 11 yJ� -o ' yyO�N MANUAL CLASS I STANDPIPE CALCULATION-B1 ISO <br /> F2 ,,cat, �GZ\ON CONNECTION:4kNOD STION OF THE TWO�101&OST REMOTE HOSE <br /> 1 `��NE OWN PER NFPA 14,SECTION 7.10.1 STANDPIPE TO BE HYDRAULICALLY <br /> 1 ,��lO TH AN ADDITIONAL 250 <br /> Y{\0 CALCULATED TO DELIVER 50d GPM THROUGHOUTTHETWO MOST <br /> Cj j ��y�aP�y �11e.9 GPM ATONE OR MORE HREMOTE 2.5 HOSE VALESOSE VALVES FOR ATOTIAL OF 1000 GPM. <br /> V' oA'd� DESIGN FLOW RATE FOR THE CONNECTIONS IDENTIFIED ABOVE: <br /> 250 GPM @ EACH VALVE(TOTAL OF 1 ODD GPM) <br /> DESIGN RESIDUAL INLETAND OUTLET PRESSURE FOR THE <br /> CONNECTIONS IDENTIFIED ABOVE:100 PSI @ EACH VALVE <br /> F DESIGN STATIC PRESSUREAND DESIGN SYSTEM DEMANDAT ..-.�..«,.....w�.er.hy <br /> FIRE DEPARTMENT CONNECTION:198 PSI @ 1000 GPM m 1 <br /> =a 'A6c mi x <br /> 7 snm.xbm.K.i.i�. <br /> .sxixxrnimoar � 1 <br /> ....... ...,.........�9 <br /> E <br /> IINN <br /> D m <br /> ❑ B11 CRITICAL DWG: <br /> ❑Waste Bldg N/A FIRE PROTECTION <br /> 0 lb Seagen° SITE LOCATION: STANDPIPE ISO 131 <br /> N <br /> CYD B3 Warehouse <br /> DP EVERETT WA <br /> FIRE SPRINKLER PLAN <br /> N , <br /> ENGINEERING APPROVAL: SITE CODE: FILE NUMBER: SCALE: ORIGINATION DATE: <br /> SAM HUBALLA <br /> B2 B4 02-22-2023 EV STANDPIPE ISO 1/8"=1'-0" 02/22/2023 <br /> B mAb Mfg/FD CUB <br /> QUALITY APPROVAL: BUILDING: SEAGEN DRAWING NUMBER: REVISION: <br /> 0 2 4 8 16 N/A 1 <br /> YD scn t/8"-1'0° B PERMIT SET NA 07/25/2023 ALO N/A A PROGRESS SET FOR GMP NA 02/22/2023 ALO SHH EHSS APPROVAL, FLOOR: EV-B1-F✓R <br /> -01-FIRE B <br /> A KEY PLAN REV REVISION DESCRIPTION CHANGE CONTRO DATE DRN APVL WA ALL <br />