Laserfiche WebLink
34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 <br /> NOTES: <br /> 1. SEE SHEET EV-B1-FB-01-FIRE FOR STANDPIPE ISO & HYDRAULIC NODES <br /> V <br /> U <br /> T A2 A2 AN AM <br /> S <br /> R B1-T/O PARAPET B1-T/O PARAPET B1-T/O PARAPET <br /> 60'-4" 60'-4" 60'-4" <br /> B1-ROOF B1-ROOF B1-ROOF <br /> Q 56'-3" 56-3" 56-3" <br /> TO ROOF STAIR SEE SHEET EV-B7-FBJ0-I-FIRE <br /> TO ROOF FIRE HOSE VALVE <br /> P <br /> LEVEL 03 FHV LEVEL 03 FHV LEVEL 03 FHV <br /> I 1 / <br /> O B1-LEVEL 03 = Bi-LEVEL 03 M� B1-LEVEL 03 M� <br /> 36'-2" 36'-2" 36'-2" - <br /> N r <br /> Y <br /> LEVEL 02 FHV LEVEL 02 FHV LEVEL 02 FHV <br /> M r <br /> L II r i <br /> - ma <br /> B1-LEVEL 02 = B1-LEVEL 02 °L B1-LEVEL 02 <br /> 18'-1° - 18'-1" <br /> LBRACE NFPAT PE"E' <br /> K LEVEL 01 FHV LEVEL 01 FHV LEVEL 01 FHV <br /> m <br /> I <br /> B1-LEVEL 01 I, M� B1-LEVEL 01 ML B1-LEVEL 01 1�� RISER CLAMP <br /> J On RISER CLAMP TYR 0" RISER CLAMP TYR On RISER CLAMP TYR <br /> I <br /> H STAIR 01 STAIR 02 STAIR 03 <br /> G <br /> FPET NICET p106245 LEVEL I�Msmc <br /> ® Bl STAIR SEC IIONS <br /> F <br /> 0 2 4 S 16 <br /> SCALE I/8'�F-0" <br /> ........ ....�.............. <br /> E <br /> �IINN <br /> D <br /> ❑ B11 CRITICAL DWG: <br /> El Waste Bldg N,A FIRE PROTECTION <br /> B5 OSeagen SITE LOCATION: <br /> STAIR SECTION <br /> YDE.Abmfg <br /> Warehouse FIRE SPRINKLER PLAN <br /> EVERETT,WA <br /> N ENGINEERING APPROVAL: SITE CODE: FILE NUMBER: SCALE: ORIGINATION DATE: <br /> 64 SAM HUBALLA <br /> CUB 02-22-2023 EV FP 0.30-B1 Cover 1/8"=V-0" 02/22/2023 <br /> B QUALITY APPROVAL: BUILDING: SEAGEN DRAWING NUMBER: REVISION: <br /> N/A 1 <br /> YD B PERMIT SET NA 07/25/2023 AL O SHH <br /> A PROGRESS SET FOR GMP NA 02/22/2023 ALO SHH EHSSAPPROVAL: FLOOR: EV-CM-FR�-02-FIRE B <br /> A KEY PLAN REV REVISION DESCRIPTION CHANGE CONTR DATE I ORN APVL WA 1 <br />