Laserfiche WebLink
Job : Boeing Cells Hydraulic Calculations <br /> PIPE INFORMATION <br /> Node 1 Elev 1 K-Factor 1 Flow added (q) Nominal ID Fittings L C Factor total (Pt) <br /> Node 2 Elev 2 K-Factor 2 Total flow (Q) Actual ID quantity x (name) = length F Pf per ft elev (Pe) NOTES <br /> T frict (Pf) <br /> (ft) (gpm/psis/z) (gpm) (in) (ft) (ft) (psi) (psi) <br /> Path No: 1 <br /> 0097 16.5 0 6 4x(90 ell)=50.8 128.84 120 63.1 <br /> 135 -7.9 150.6 6.357 2x(45ell)=17.6 100.21 0.0008 10.6 <br /> lx(tee-Br)=31.81 229.05 0.2 <br /> 135 -7.9 0 8 0.12 120 73.8 <br /> 136-0 -8.01 150.6 8.329 0 0.0002 0.1 <br /> 0.12 0 <br /> 136-0 -8.01 0 8 0.96 73.9 Gate A2360 <br /> 136-I -8.97 150.6 0 0 0.1044 0.4 *** <br /> 0.96 0.1 <br /> 136-I -8.97 0 8 lx(tee-Br)=43.09 2.61 120 74.4 <br /> 138 -11.58 150.6 8.329 43.09 0.0002 1.1 <br /> 45.7 0.0 <br /> 138 -11.58 0 10 6.13 120 75.5 <br /> W1 -11.58 150.6 10.42 0 0.0001 0 <br /> 6.13 1 0 <br /> W 1 75.5 <br /> Path No: 2 <br /> 621 9.75 5.6 19.7 1 lx(tee-Br)=5 1.09 120 12.3 <br /> 0011 9.75 19.7 1.049 5 0.1256 0 <br /> 6.09 0.8 <br /> 0011 9.75 0 1.5 5.06 120 13.1 <br /> 0006 9.75 19.7 1.68 0 0.0127 0 <br /> 5.061 1 0.1 <br /> 0006 13.2 <br /> Path No: 3 <br /> 623 10 5.6 19.7 1 lx(tee-Br)=5 0.45 120 12.4 <br /> 0005 9.75 19.7 1.049 1x(90 ell)=2 7 0.1265 0.1 <br /> 7.45 0.9 <br /> 0005 13.5 <br /> Path No: 4 <br /> 624 10 5.6 20.4 1 lx(tee-Br)=5 0.45 120 13.3 <br /> 0004 9.75 20.4 1.049 1x(90 ell)=2 7 0.135 0.1 <br /> 7.45 1 <br /> 0004 14.4 <br /> Path No: 5 <br /> 625 10 5.6 21.6 1 lx(tee-Br)=5 0.45 120 14.9 <br /> 0003 9.75 21.6 1.049 1x(90 ell)=2 7 0.1497 0.1 <br /> 7.45 1.1 <br /> 0003 16.1 <br /> File:C:\Users\yates\Documents\dwg2\burns\tenant improvements\boeing\Ti 1_21_25\submittal\Boeing cell ti <br /> 2025.dwg <br /> Date 2/4/2025 Copyright©2002-2012 Tyco Fire Protection Products Page 10 <br />