City of Everett 00 52 13 - 1 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 52 13 - 1 AGREEMENT FORM <br />SECTION 00 52 13 - AGREEMENT FORM <br /> <br />CONTRACT <br />THIS CONTRACT is made and entered by and between the City of Everett, Washington, <br />a municipal corporation existing under the laws of the State of Washington (the “City”) <br />and Absher/Stellar J Joint Venture, (the “Contractor”). <br /> <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete <br />in a workmanlike manner the work, improvements, and/or appurtenances in accordance <br />with the Specifications and Drawings and all other Contract Documents entitled: “Port <br />Gardner Storage Facility – Facility Construction Package” (the “Project”). <br />1. Contract Documents. The “Contract Documents” are defined in the General <br />Conditions. The Contract Documents are part of this Contract and are hereby <br />incorporated by reference. Terms that are capitalized in a Contract Document but not <br />defined in that Contract Document shall have the meaning defined to them in the other <br />Contract Documents. A copy of the Contract Documents that were posted for the <br />Project on Builder’s Exchange of Washington (www.bxwa.com) as of Bid Opening Date <br />is maintained by the City Clerk’s Office as a single pdf and is available as follows: <br />Link to PDF <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted <br />Contract Documents as of the Bid Opening Date. City and Contractor further agree that <br />this pdf may contain some other documents (such as Reference Information) that are <br />not Contract Documents. <br />2. Contract Time. Substantial Completion of the Work shall be achieved within <br />Seven Hundred Sixty (760) calendar days after the effective date of the Notice to <br />Proceed. Physical Completion shall be within thirty (30) calendar days after the actual <br />date of issuance of Substantial Completion. (Contractor acknowledges that, in <br />accordance with the Washington State Department of Ecology Agreed Order <br />11638, all Work associated with combined sewer overflow control must be <br />substantially complete by December 31, 2027.) Contractor shall cause the Project to <br />be ready for Final acceptance no later than ninety (90) calendar days following <br />Substantial Completion.