Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> PERMIT EXTENSION SHARON EXTENSION <br /> 12/19/2024 12/19/2024 (REASON GILFEATHER APPROVED <br /> REQUIRED) <br /> Notes: <br /> SUPPLY ISSUE <br /> 12/20/2024 12/20/2024 BLDG 16-FINAL RAKEEB KHAN CORRECTION <br /> REQUIRED <br /> Notes: <br /> INSPECTIONS@INFINITYSOLAR.COM <br /> GREG <br /> 206-743-5157 <br /> Need electrical final approval <br /> 12/20/2024 12/20/2024 ELEC 10-FINAL** STEVE BANKS CORRECTION <br /> REQUIRED <br /> Notes: <br /> Install conductors for the one line diagram from the combiner panel to the array.Label,service panel,dual fed,etc. <br /> 2/18/2025 2/18/2025 BLDG 16-FINAL Matt Schreifels APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 2/13/2025 1:21 PM Mary Dinsmore-Smith <br /> Contact Name:GREG INGERSOL <br /> Site Address:2107 ROCKEFELLER AVE <br /> Phone:2067435157 <br /> e-Mail:INSPECTIONS@ INFINITYSOLARUSA.COM <br /> 2/18/2025 2/18/2025 ELEC 10-FINAL** MICHAEL PARTIAL eTRAKiT Inspection Request <br /> WICKLANDER APPROVAL <br /> Notes: <br /> 2/13/2025 1:21 PM Mary Dinsmore-Smith <br /> Contact Name:GREG INGERSOL <br /> Site Address:2107 ROCKEFELLER AVE <br /> Phone:2067435157 <br /> e-Mail:INSPECTIONS@ INFINITYSOLARUSA.COM <br /> Inspector SKB changed the inspection assignment from SKB to MHW <br /> Approve Electrical portion of PV permit. <br /> 2/19/2025 T_ CERTIFICATE OF permit Technician <br /> OCCUPANCY <br /> Notes: <br /> I <br /> Printed:Wednesday, 19 February, 2025 2 of 2 <br /> SUPERION <br />