Laserfiche WebLink
PHOTOVOLTAIC ROOF MOUNT SYSTEM 0 <br /> 13 MODULES-ROOF MOUNTED - 5.330 kW DC, 5.376 kW AC, 2107 ROCKEFELLER AVE, EVERETT, WA 98201 infinitysolar <br /> INFINITY HOME SOLUTIONS <br /> 6405 E MILL PLAIN <br /> PHOTOVOLTAIC SYSTEM SPECIFICATIONS: SITE DETAIL: SHEET INDEX: DS 07: WIRING SPECIFICATION VANCOUVERWA9 661 <br /> UTILITY: SNOHOMISH PUD PV 0.0: GENERAL NOTES AND PROJECT DATA DS 08: MOUNTING-DATA SHEET PHONE:1-800-818-0598 <br /> 5.376 kW AC <br /> SYSTEM SIZE: 5.3 kW DC MSP: EXISTING 200A MSP WITH 2O0A MAIN BREAKER PV 1.0: PLOT PLAN DS 09: RACKING-DATA SHEET INFINITY SOLAR.COM <br /> MODULE TYPE&AMOUNT: (13)ZNSHINESOLAR ZXM7-SH108-410M ROOF MATERIAL: COMPOSITE SHINGLE PV 1.1: SITE PLAN DS 10: RACKING-GROUNDING REVISIONS <br /> MODULE DIMENSIONS: (L/W/H)67.87"/44.64"/1.8" ASCE 7-10 WINDSPEEDS: (3 SEC GUST IN MPH) PV 1.2: ROOF SECTION DS 11: RACKING-CERTIFICATION <br /> Description Date Rev <br /> INVERTER: (07)AP SYSTEMS DS3-L RISK CATEGORY II: 110 MPH IM 1.0: INVERTER MAP Initial Design 4/11/24 00 <br /> INTERCONNECTION METHOD: SUPPLY BREAKER S 1.1: MOUNT DETAILS <br /> AHJ: CITY OF EVERETT E 1.1: 3-LINE DIAGRAM <br /> E 1.2: NOTES <br /> RACKING: GRASOL RACKING SYSTEM FOR COMP ROOF E 1.3: WARNING LABELS <br /> ARRAY AREA: 21.04 SQFT x 13=273.5 SQFT DS 01: PV MODULE SPECIFICATION SHEET Signature with Seal <br /> DS 02: MICROINVERTER SPECIFICATION SHEET <br /> DS 03: COMBINER PANEL CERTIFICATION ' <br /> DS 04: AC DISCONNECT UL CERTIFICATION , <br /> DS 05: AC DISCONNECT UL CERTIFICATION <br /> DS 06: JUNCTION BOX UL CERTIFICATION <br /> tt - <br /> PHOTOVOLTAIC NOTES: <br /> 1.AN INVERTER OR AN AC MODULE IN AN INTERACTIVE PHOTOVOLTAIC SYSTEM SHALL AUTOMATIC ALL WITH THE"SMACNA"-GUIDLINES FOR SEISMIC RESTRAINS OF MECHANICAL SYSTEMS AND PLUMING PIPING -. <br /> DE-ENERGIZE ITS OUTPUT TO THE CONNECTED ELECTRICAL PRODUCTION AND DISTRIBUTION NETWORK SYSTEMS. <br /> UPON LOSS OF VOLTAGE IN THAT SYSTEM AND SHALL REMAIN IN THAT STATE UNTIL THE ELECTRICAL 22.ALL OF THE LISTED SYSTEMS REQUIRED THAT THE SEISMIC LATERAL FORCE F INCLUDING Project Name& <br /> PRODUCTION AND DISTRIBUTION NETWORK VOLTAGE HAS BEEN RESTORED.(NEC 690361) CONSIDERATION OF a A P AND rAP BE DETERMINED AT EACH LEVEL OF THE BUILDING SO THAT BRACE Address <br /> 2.ALL EXTERIOR ELECTRICAL METALLIC TUBING(EMT)CONDUIT FITTING SHALL BE RAIN TIGHT SPACING CAN BE CALCULATED.THE DISTRICT STRUCTURAL ENGINEER CAN APPROVE THE SEISMIC <br /> THREAD-LESS COMPRESSION TYPE. LATERAL FORCE DETERMINATION. 'r LU <br /> 3.MODULES AND SUPPORT STRUCTURES SHALL BE GROUNDED 23.A COPY OF THE CHOSEN BRACING SYSTEM(S)INSTALLATION GUIDE/MANUAL SHALL BE ON THE JOB <br /> 4.NAMEPLATES SHALL BE PROVIDED FOR ALL CIRCUITS IN THE SERVICE DISTRIBUTION AND POWER SITE PRIOR TO STARTING THE INSTALLING OF HANGERS AND/OR BRACES. <br /> DISTRIBUTION SWITCH BOARDS,PANEL BOARDS,DISCONNECTING SWITCHES,TERMINAL CABINETS, 24.WHEN INSTALLING DRILLED-IN ANCHORS AND/OR POWDER DRIVEN PINS IN EXISTING }t - - LULU <br /> LUETC. ALL NAMEPLATES SHALL BE PERMANENTLY ATTACHED AND BE OF SUFFICIENT CAPACITY TO NON-PRESTRESSED REINFORCED CONCRETE,USE CARE AND CAUTION TO AVOID CUTTING OR t <br /> WITHSTAND THE WEATHER. DAMAGING THE REINFORCED BARS.WHEN INSTALLING THEM INTO EXISTING PRE-STRESSED CONCRETE t t -�' LU < � <br /> 5.JUNCTION BOX/COMBINER BOX HAVE TO USE COMPRESSION TYPE STRAIN RELIEF POSITIONED FOR TENDONS BY USING A NON-DESTRUCTIVE METHOD PRIOR TO INSTALLATION.EXERCISE EXTREME CARE j j." _ . .'t w o Q Q <br /> APPROPRIATE WATER RUN OFF. AND CAUTION TO AVOID CUTTING OR DAMAGING THE TENDONS DURING INSTALLATION.MAINTAIN A _ }► -,-+�' J J Q Z <br /> 6.CONDUIT RUNS SHALL BE PROVIDED WITH SUFFICIENT WEATHERPROOF PULL BOXES OF JUNCTION MINIMUM CLEARANCE OF ONE INCH BETWEEN THE REINFORCEMENT AND THE DRILLED-IN ANCHOR. 0 LU 3: r Z <br /> BOX/COMBINER BOXES PER APPROPRIATE NEC REQUIREMENTS. 25.THE WORKING CLEARANCES AROUND THE EXISTING ELECTRICAL EQUIPMENT AS WELL AS THE NEW ~t � W � z J <br /> 7.SEE PROVIDED CUT SHEETS FOR ADDITIONAL EQUIPMENT SPECIFICATIONS ELECTRICAL EQUIPMENT WILL BE MAINTAINED IN ACCORDANCE WITH NEC 110.26. LU U I j O Q <br /> 8.WIRING MATERIALS SHALL BE SUITABLE FOR THE SUN EXPOSURE AND WET LOCATIONS.FIELD 26.CONDUCTORS EXPOSED TO SUNLIGHT SHALL BE LISTED AS SUNLIGHT RESISTANT.(NEC 300.6 01,310.8 D) 2 SATELLITE VIEW z 0 w M w <br /> APPLIED PROTECTIVE COATINGS ARE NOT ACCEPTABLE. 27.GROUNDING BUSHINGS ARE REQUIRED AROUND PRE-PUNCHED CONCENTRIC KNOCKOUTS ON THE - > <br /> 9.JUNCTION,PULL AND OUTLET BOXES LOCATED BEHIND MODULES SHALL BE SO INSTALLED THAT THE DC SIDE OF THE SYSTEM.(NEC 250.97) Pv o.o SCALE:NTS CDLU <br /> WIRING CONTAINED IN THEM CAN BE RENDERED ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF 28.THE GROUNDING ELECTRODE CONDUCTOR MUST BE PROTECTED FROM PHYSICAL DAMAGE IF W N <br /> MODULE(S)SECURED BY REMOVABLE FASTENERS AND CONNECTED BY A FLEXIBLE WIRING SYSTEM.(NEC 690.34) SMALLER THAN#6 COPPER WIRE.(NEC 250.64 B) U <br /> Jefl a <br /> Red Llon Inn 8 W <br /> Y lOtlr Sl <br /> 1 E HA - �0.IN AN UNDERGROUND PHOTOVOLTAIC SYSTEM THE POWER SOURCE SHALL BE LABELED WITH THE 29.GROUNDING ELECTRODE CONDUCTOR WILL BE CONTINUOUS EXCEPT FOR SPLICES OR JOINTS AT - <br /> isianrr (�oays�ae Swtes Everan <br /> FOLLOWING WARNING AT EACH JUNCTION BOX,COMBINER BOX,DISCONNECT AND DEVICE WHERE THE BUSBARS WITHIN LISTED EQUIPMENT.(NEC 250.64 C) Q <br /> stumedun <br /> UNGROUNDED CIRCUITS MAYBE EXPOSED DURING SERVICE:"WARNING-ELECTRIC SHOCK HAZARD. 30.RACEWAY FOR GROUNDING ELECTRODE CONDUCTOR SHALL BE BONDED AT EACH END.(CEC 250.64(E) Q Rrn"mane" DELTA <br /> 0 <br /> Brewing <br /> Regional <br /> THE CURRENT CIRCUIT CONDUCTORS OF THIS PHOTOVOLTAIC POWER SYSTEM ARE UNGROUNDED BUT 31.WHERE ALL TERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITION, HefP le'go QMed cal Center <br /> MAY BE ENERGIZED WITH THE RESPECT TO GROUND DUE TO LEAKAGE PATHS AND/OR GROUND(NECE 690.35(F)) A SIGN WILL BE PROVIDED WARNING OF THE HAZARD PER NEC 690.17.34.EACH UNGROUNDED -Sea"ie eue.eu- <br /> 11.ALL PHOTOVOLTAIC MODULES AND ASSOCIATED EQUIPMENT AND WIRING MATERIAL SHALL BE PROTECTED CONDUCTOR OF THE MULT-IWIRE BRANCH CIRCUIT WILL BE IDENTIFIED PER PHASE AND SYSTEM PER Sheet Name <br /> FROM ANY PHYSICAL DAMAGE. NEC210.5. !nnatPartc„Aier. 16N,S, GENERAL NOTES <br /> 12.ALL ELECTRICAL DEVICES AND UTILIZATION EQUIPMENT SHALL BE LISTED BY AN APPROVED TESTING AGENCY. 32.CIRCUITS OVER 250V TO GROUND SHALL COMPLY WITH NEC250.97&250.92(B)&LAMC 93.250.97. Q j er"" Qsmaway 3 AND PROJECT <br /> 13.OUTDOOR EQUIPMENT SHALL BE AT LEAST NEMA 3R RATED. 33.DC CONDUCTORS EITHER DO NOT ENTER THE BUILDING OR ARE RUN IN METALLIC RACEWAYS OR Qseoway <br /> a,3 \ DATA <br /> 14.ALL SPECIFIED WIRING IS BASED ON THE USE OF COPPER ENCLOSURES TO THE FIRST ACCESSIBLE DC DISCONNECTING MEANS PER NEC 690.31(E),LAMC 93.690.31(E) ""a°" ftst ! ``!Q <br /> (F"1"earth <br /> 15.CONTRACTOR SHALL OBTAIN ELECTRICAL PERMITS AND SHALL COORDINATE ALL INSPECTION, 34.ALL METALLIC FRAME RAILS AND OTHER CURRENT CARRYING METALLIC COMPONENTS(CONDUIT, E"" O F'nit a Sheet Size <br /> COMMISSIONING AND ACCEPTANCE WITH THE CLIENT,UTILITY CO.AND CITY INSPECTORS AS NEEDED JUNCTION&PULL BOXES,RACEWAY,ETC)SHALL BE SOLIDLY GROUNDED PER THE MANUFACTURER'S 9 <br /> ANSI B <br /> 16.DRAWINGS ARE DIAGRAMMATIC ONLY,ROUTING OF RACEWAYS SHALL BE AT THE OPTION OF THE INSTALLATION INSTRUCTIONS LAMC 93.690.110.3&93.110.3(B). 2Eve EverRioett, <br /> WA 98201- <br /> Everett,WA 9 e2 Ave, <br /> CONTRACTOR UNLESS OTHERWISE NOTED AND SHALL BE COORDINATED WITH OTHER TRADES. 35.SCREWS,NUTS,BOLTS&WASHERS THAT ATTACH EQUIPMENT GROUNDING LUGS SHALL BE = 2839,united States 011 <br /> n X 7n <br /> 17.IF DISTANCES OF CABLE RUNS ARE DIFFERENT THAN SHOWN,THE CONTRACTOR SHALL NOTIFY STAINLESS STEEL LAMC 93.110.3(B). <br /> ELECTRICAL ENGINEER TO VALIDATE THE WIRE SIZE.FINAL DRAWINGS WILL BE RED-LINED AND UPDATED AS 36.NO PIPING,DUCTS OR EQUIPMENT FOREIGN TO ELECTRICAL EQUIPMENT SHALL BE PERMITTED TO BE _ Sheet Number <br /> APPROPRIATE. LOCATED WITHIN THE DEDICATED SPACE ABOVE THE ELECTRICAL EQUIPMENT. <br /> 18.WHENEVER A DISCREPANCY IN QUANTITY OF EQUIPMENT,ARISES ON THE DRAWINGS OR 37.ALL FIELD INSTALLED JUNCTION,PULL AND OUTLET BOXED LOCATED BEHIND MODULES OR PANELS by,:;,,Q EVef"AVe 3 ��V/ O O <br /> SPECIFICATIONS,THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL SHALL BE ACCESSIBLE DIRECTLY OR BY DISPLACEMENT OF A MODULE(S)OR PANEL(S)SECURED BY s <br /> MATERIAL AND SERVICES REQUIRED BY THE STRICTEST CONDITIONS NOTED ON THE DRAWINGS OR IN REMOVABLE FASTENERS. r ;e Everett J <br /> THE SPECIFICATIONS TO ENDURE COMPLETE COMPLIANCE AND LONGEVITY OF THE OPERABLE SYSTEM 38.REMOVAL OF A DWP-INTERACTIVE INVERTER OR OTHER EQUIPMENT SHALL NOT DISCONNECT THE n,l,.,r •, p <br /> Seattle/E"eielr Petite Ave �a_Ita Ho!els <br /> REQUIRED BY THE ARCHITECT/ENGINEER. BONDING CONNECTION BETWEEN THE GROUNDING ELECTRODE CONDUCTOR AND THE PHOTOVOLTAIC <br /> 19.ALL BROCHURES,OPERATION MANUALS,CATALOGS,SHOP DRAWINGS,ETC.SHALL BE HANDED SOURCE AND/OR OUTPUT CIRCUIT GROUNDED CONDUCTOR. 9 <br /> OVER TO THE OWNER'S REPRESENTATIVE AT THE COMPLETION OR WORK. 39.THE ROOF MOUNTED PHOTOVOLTAIC MODULES,PANELS,OR SOLAR VOLTAIC ROLL ROOFING �raure Ralmds n�o e. <br /> 20.ALL WIRING CONCEALED IN WALL AND CEILING SPACES SHALL BE IN METAL CONDUIT. MATERIAL SHALL HAVE THE SAME OR BETTER LISTED FIRE-RESISTANCE RATING THAN THE BUILDING W, <br /> 21.THE SEISMIC BRACING AND ANCHORAGE OF ELECTRICAL CONDUITS SHALL BE IN ACCORDANCE ROOF-COVERING MATERIAL. <br /> 1 GENERAL NOTES AND PROJECT DATA 40.ALL ROOF MOUNTED CONDUIT WILL BE A MINIMUM 1/2"OFF THE ROOF SURFACE. VICINITY MAP <br /> Pv 00 <br /> Pv 0.0 SCALE:NTS <br />