My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HDR Engineering, Inc. 11/18/2025 Amendment 1
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
HDR Engineering, Inc. 11/18/2025 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:06:20 AM
Creation date
11/21/2025 11:05:55 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
HDR Engineering, Inc.
Approval Date
11/18/2025
Council Approval Date
11/5/2025
End Date
12/31/2027
Department
Public Works
Department Project Manager
Shaun Bridge
Subject / Project Title
Water, Filtration, Sewer, Stormwater Rate Modeling and Implementation
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004302
Total Compensation
$85,710.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
Document Relationships
HDR Engineering, Inc. 4/10/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Agreement\Professional Services (PSA)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
HDR_Ongoing Rate Model <br />Support_Amendment No. 1_SB_2025.11.05_SD <br />Final Audit Report 2025-11-18 <br />Created:2025-11-12 <br />By:Marista Jorve (mjorve@everettwa.gov) <br />Status:Signed <br />Transaction ID:CBJCHBCAABAAvZ10t6pOha2zprboP8oIh4pEaMBYyfGV <br />"HDR_Ongoing Rate Model Support_Amendment No. 1_SB_202 <br />5.11.05_SD" History <br />Document created by Marista Jorve (mjorve@everettwa.gov) <br />2025-11-12 - 6:53:55 PM GMT <br />Document emailed to Shaun Bridge (SBridge@everettwa.gov) for approval <br />2025-11-12 - 7:32:05 PM GMT <br />Email viewed by Shaun Bridge (SBridge@everettwa.gov) <br />2025-11-13 - 6:14:39 PM GMT <br />Document approved by Shaun Bridge (SBridge@everettwa.gov) <br />Approval Date: 2025-11-13 - 6:14:57 PM GMT - Time Source: server <br />Document emailed to Olivia Williams (olivia.williams@hdrinc.com) for signature <br />2025-11-13 - 6:15:01 PM GMT <br />Email viewed by Olivia Williams (olivia.williams@hdrinc.com) <br />2025-11-13 - 7:13:01 PM GMT <br />Email viewed by Olivia Williams (olivia.williams@hdrinc.com) <br />2025-11-17 - 6:24:09 PM GMT <br />Document e-signed by Olivia Williams (olivia.williams@hdrinc.com) <br />Signature Date: 2025-11-18 - 7:19:56 PM GMT - Time Source: server <br />Document emailed to Tim Benedict (TBenedict@everettwa.gov) for approval <br />2025-11-18 - 7:19:59 PM GMT <br />Email viewed by Tim Benedict (TBenedict@everettwa.gov) <br />2025-11-18 - 7:20:20 PM GMT
The URL can be used to link to this page
Your browser does not support the video tag.