Laserfiche WebLink
Exhibit A <br />Change Order No. 1 <br />Change Order Effective Date: 3/06/2025 <br />Exhibit A—Description of Changed Work <br />This Change Order No. 1 modifies three (3) Existing Items and adds thirteen (13) New <br />Items to the Contract. <br />Existing Item No. 11: Zone A Onsite Spoil Stockpiling. Delete 5000 Cubic Yards (CY) from <br />Bid Item 11, Zone A Onsite Stockpiling, at the Contract Unit Price Rate of $9.50 per CY <br />resulting in a decrease to the contract of $47,500.00. <br />Existing Item No. 12: Zone A Over-excavation. Delete 1000 Cubic Yards (CY) from Bid Item <br />12, Zone A Over-excavation, at the Contract Unit Price Rate of $70.00 per CY resulting in a <br />decrease to the contract of $70,000.00. <br />Existing Item No. 13: Over-excavation. Delete 100 Cubic Yards (CY) from Bid Item 13, Over- <br />excavation, at the Contract Unit Price Rate of $200.00 per CY resulting in a decrease to the <br />contract of $20,000.00. <br />Justification for modifying Existing Items 11,12, and 13 <br />These items under-ran therefore they are modified to reconcile planned unit price quantity with <br />the as-built unit price work performed. <br />New Item No. 101: City Staff Trailer. Add new Unit Price item No. 101 entitled, “City Staff <br />Trailer” by adding 20 months (MN) at a Unit Price of $665.50 per MN resulting in an increase to <br />the contract of $13,310.00. <br />Justification for creating New Item No. 101 <br />This item will be used to compensate the contractor for providing an onsite office facility for COE <br />field staff. <br />New Item No. 102: Charles Valve Replacement. Add new Lump Sum item No. 102 entitled <br />“Charles Valve Replacement” in the Lump Sum amount of $93,147.81 resulting in an increase <br />to the contract of $93,147.81. <br />Justification for creating New Item No. 102 <br />This item will be used to compensate the contractor for installing an additional valve on <br />transmission line to improve the operational efficiency of the transmission lines. <br />New Item No. 103: Lauren Connection- Added Valve/DMJ. Add new Lump Sum item No. 103 <br />entitled “Lauren Connection- Added Valve/DMJ” in the Lump Sum amount of $45,338.18 <br />resulting in an increase to the contract of $45,338.18. <br />Justification for creating New Item No. 103 <br />This item will be used to compensate the contractor for installing an additional valve and DMJ on <br />transmission line to improve the operational efficiency of the transmission lines.