IMCO General Construction, Inc. 11/17/2025 Change Order 1
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
IMCO General Construction, Inc. 11/17/2025 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/21/2025 11:19:38 AM
Creation date
11/21/2025 11:19:14 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
IMCO General Construction, Inc.
Approval Date
11/17/2025
Council Approval Date
6/26/2024
Department
Public Works
Department Project Manager
Randy Loveless
Subject / Project Title
Construction of Reservoir 3 Phase 1
Public Works WO Number
UP3739
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0004389
Total Compensation
$578,398.31
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
IMCO General Construction, Inc. 6/10/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A <br />Justification for creating New Item No. 109 <br />This item will be used to compensate the contractor for providing and installing HVAC Equipment <br />as an enhanced safety feature in the Flow Meter Vault. <br />New Item No. 110: Revised topsoil Import. Add new Unit Price item No. 110 entitled, <br />“Revised topsoil Import” by adding 250 Cubic Yards (CY) at a Unit Price of $34.12 per CY <br />resulting in an increase to the contract of $8,530.00. <br />Justification for creating New Item No. 110 <br />This item will be used to compensate the contractor for providing and placing import topsoil due <br />to there being no existing topsoil for reuse. <br />New Item No. 111: Res 4 Valve Vault Modifications. Add new Lump Sum item No. 111 <br />entitled “Res 4 Valve Vault Modifications” in the Lump Sum amount of $39,084.55 resulting in <br />an increase to the contract of $39,084.55. <br />Justification for creating New Item No. 111 <br />This item will be used to compensate the contractor for conducting modifications and partial <br />demolition of the existing valve vault at Res 4 to complete the regulatory physical separation of <br />Res 4 from potable transmission lines. <br />New Item No. 112: Chlorination Building Fixture Upgrade. Add new Lump Sum item No. 112 <br />entitled “Chlorination Building Fixture Upgrade” in the Lump Sum amount of $8,583.49 resulting <br />in an increase to the contract of $8,583.49. <br />Justification for creating New Item No. 112 <br />This item will be used to compensate the contractor for upgrading light fixture in the Chlorination <br />Building. <br />New Item No. 113: SDMH 001 Pipe Connection Modification. Add new Lump Sum item No. <br />113 entitled “SDMH 001 Pipe Connection Modification” in the Lump Sum amount of $86,663.45 <br />resulting in an increase to the contract of $86,663.45. <br />Justification for creating New Item No. 113 <br />This item will be used to compensate the contractor for impacts due to unforeseen alignment and <br />sequence conflicts. <br />Washington State Sales tax. The sale tax rate of 9.9 percent applied to these changes will result <br />in an increase to the contract of $52,103.21. <br />Time: There will be no added time to the Contract for this change.