My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reid Middleton 11/24/2025
>
Contracts
>
Agreement
>
Professional Services (PSA)
>
Reid Middleton 11/24/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2025 9:46:09 AM
Creation date
11/25/2025 9:45:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reid Middleton
Approval Date
11/24/2025
Council Approval Date
11/12/2025
End Date
12/31/2026
Department
Parks & Community Services
Department Project Manager
Lisa Page
Subject / Project Title
Everett Police Department Boathouse Design
Tracking Number
0005026
Total Compensation
$247,600.00
Contract Type
Agreement
Contract Subtype
Professional Services (PSA)
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Reid Middleton, Inc. <br />Exhibit "A" Schedule of Charges <br />Effective July 1, 2025 through June 30, 2026 <br />I.Personnel Hourly Rate <br />Principal ......................................................................................................................$ 270.00 - $ 320.00Associate Principal/Principal Engineer/Principal Planner/Principal Surveyor............$ 240.00 - $ 280.00Associate.....................................................................................................................$ 215.00 - $ 250.00Senior Engineer/Senior Planner/Senior Surveyor .......................................................$ 195.00 - $ 220.00Senior Designer...........................................................................................................$ 185.00 - $ 200.00Project Engineer/Project Designer/Project Surveyor/Project Planner.........................$ 180.00 - $ 195.00Design Engineer/Designer II/Design Technician/Survey Crew Chief/ Technical Writer II/ Graphic Designer II.................................................................$ 160.00 - $ 180.00Designer I/Planner/CAD Technician II.......................................................................$ 150.00 - $ 160.00Project Administrator..................................................................................................$ 135.00 - $ 150.00CAD Technician I/Survey Technician/Technician/Technical Writer I ......................$ 110.00 - $ 135.00 <br />Survey Crew (1 Person/RTK/Robotic/Scanning)........................................................$ 170.00Survey Crew (2 Person/RTK/Robotic/Scanning)........................................................$ 225.00Survey Crew (3 Person/ RTK/Robotic/Scanning)…………………………………… $ 280.00 <br />Expert Witness/Forensic Engineering.........................1.5 times usual hourly rate (4 hour minimum) <br />Individuals not in the regular employ of Reid Middleton may occasionally be engaged to meet specific project requirements. Charges for such personnel will be comparable to charges for regular Reid Middleton personnel. <br />A premium may be charged if project requirements make overtime work necessary. <br />II.Equipment Rate <br />Design Software/Computer Aided Drafting ...............................................................$ 12.00/hour <br />III.Reimbursable Expenses <br />Local Mileage - Automobile .......................................................................................$ 0.70/mileLocal Mileage - Survey Truck ....................................................................................$ 0.70/mile <br />Expenses that are directly attributable to the project are invoiced at cost plus 15%. These expenses include, but are not limited to, subconsultant or subcontractor services, travel and subsistence, communications, couriers, postage, fees and permits, document reproduction, special instrumentation and field equipment rental, premiums for additional insurance where required, special supplies, and other costs directly applicable to the project. <br />A new schedule of charges is issued and becomes effective July 1 each year. Charges for all work, including continuing projects initiated in prior years, will be based on the latest schedule of charges. <br />Exhibit A (Scope of Work)
The URL can be used to link to this page
Your browser does not support the video tag.