Laserfiche WebLink
AMC <br /> Am nu Mechanical C.,P..fi.. <br /> PLUMBING•HEATING•SERVICE <br /> PIPING SYMBOLS AND ABBREVIATIONS <br /> BLVD <br /> Sr 1.11301-ti INDICATED HERE AND NOT USED IN THE CONTRACT DOCUMENTS DO NOT 15820BURIEN,WA 811AMBAUM 98116 <br /> SE <br /> APPLY TO THIS PROJECT.ADDITIONAL SYMBOLS MAY BE INDICATED IN THE CONTRACT DOCUMENTS. <br /> SHEET SYMBOLS PIPE FITTINGS,VALVES,&SPECIALTIES ABBREVIATIONS PROJECT DATA SHEET LIST <br /> Project Name: RALIBERTO'S TACO SHOP <br /> SCHEDULED EQUIPMENT DESIGNATION. Q REVISION REFERENCE. PLUG VALVE EXPANSION JOINT A AIR L •LENGTH Project Address: 2232 COLBY AVE <br /> EO -TOP INDICATES EQUIPMENT AAP -AREA ALARM PANEL LA <br /> REFER TO SHEET REVISION LABORATORY COMPRESSED AIR EVERETT,WA 98201 P-1.0 PROJECT INFORMATION <br /> 4 ABBREVIATION BLOCK GATE VALVE PIPE FLEXIBLE CONNECTION ACC -ACCESS LAV -LAVATORY Parcel#: P-1.1 PLUMBING PLAN,DETAILS&SCHEDULES <br /> -BOTTOM INDICATES EQUIPMENT ACFM -ACTUAL CUBIC FEET PER MINUTE LBS -POUNDS <br /> NUMBER 0SHEET KEYNOTE REFERENCE DIAPHRAGM VALVE ADS -ACID DILUTION BASIN LTG -LIGHTING <br /> REFER TO EQUIPMENT SCHEDULES -� DIRECTION OF PITCH(DOWN) ADJ -ADJUSTABLE LWT -LEAVING WATER TEMPERATURE Client/Tenant: <br /> SPECIALTY ITEMS BALL VALVE AFF -ABOVE FINISHED FLOOR Contact: <br /> ROOM NAME GENERAL PIPELINE STRAINER ALT -ALTERNATE MAP -MASTER ALARM PANEL <br /> O (I.E.GAUGE FILTER,ETC.) ROOM NAME d NUMBER BUTTERFLY VALVEWITHOUT DRAIN MAPS -AMPERES MAX MAXIMUM Address: <br /> REFER TO EQUIPMENT LIST t01 DESIGNATION AP -ACCESS PANEL MB MOP BASIN <br /> BALANCING VALVE WATER SYSTEM PIPELINE APPROX-APPROXIMATE MBH -ONE THOUSAND BTUH Phone: <br /> 1 HALFTONE LIGHT LINE STRAINER ARCH -ARCHITECTURAL MC -MECHANICAL CONTRACTOR Email: <br /> M-1 INDICATES EXISTING WORK ��CHECK VALVE ASME -AMERICAN SOCIETY OF MEZZ -MEZZANINE <br /> SECTION DESIGNATION. ` MECHANICAL ENGINEERS MFR -MANUFACTURER w <br /> -TOP INDICATES SECTION NUMBER, HEAVY DASHED LINE WITH ASSY -ASSEMBLY MH -MANHOLE Architect: <br /> HATCH INDICATES PRESSURE REDUCING VALVE PIPE GUIDE MIN MINIMUM+MINUTE <br /> .BOTTOM INDICATES ON WHICHBHPBRAKEMISC Contact: <br /> SHEET SECTION APPEARS �y DEMOLISHED <br /> TO BE �SOLENOID VALVE PIPE SLEEVE BLDG -BUILDING HORSEPOWER M D -MOUNTED MISCELLANEOUS Address: <br /> HEAVY LINE INDICATES BOP -BOTTOM OF PIPE ELEVATION MTG -MOUNTING <br /> DETAIL REFERENCE. -I�ANCHOR BOT -BOTTOM Phone: <br /> 2 -TOP INDICATES SECTION NUMBER, NEW WORK BACKWATER VALVE B7 -BATHTUB NC -NORMALLY CLOSED <br /> M-1 -BOTTOM INDICATES ON WHICH BTU -BRITISH THERMAL UNIT NIC -NOT IN CONTRACT Email: y <br /> SHEET SECTION APPEARS I-THERMOSTATIC MIXING VALVE FLANGE BTUH -BRITISH THERMAL UNITS NO -NUMBER °t <br /> PER HOUR NOM -NOMINAL Contractor: AMERICAN MECHANICAL CORP <br /> JIF-UNION BTWN •BETWEEN NPSH NET NATIONAL <br /> PIE SUCTION HEAD Contact: CHRIS CLEMENS <br /> TEMPERATURE BLENDING VALVE NPT -NATIONAL PIPE THREAD <br /> ]PIPE CAP CA -COMPRESSED AIR NITS -NOT TO SCALE Address: 15820 AMBAUM BLVD SW,BURIEN,WA 98166 <br /> PIPING SYSTEM LABELS CFCI CONTRACTOR FURNISHED Phone: 206.467.6407 <br /> CONTRACTOR INSTALLED OC -ON CENTER <br /> PRESSURE RELIEF VALVE -JrILTER CFM -CUBIC FEET PER MINUTE OD -OUTSIDE DIAMETER Email: CCLEMENS@AMERCANMECHANICALCORP.COM <br /> WATER WASTE OR STORM {d CU3 -CEILING OVERFLOW DRAIN <br /> --DCW-DOMESTIC COLD WATER AN-WASTE OR SOIL I CM -COFFEE MAKER OFCI -OWNER FURNISHED, <br /> CMU CONCRETE MASONRY UNIT CONTRACTOR INSTALLED 00 <br /> �HW-DOMESTIC HOT WATER -SD-SUBSOIL DRAIN O1 VALVE IN VERTICAL THERMOMETER CO CLEANOUT OFq -OWNER FURNISHED, <br /> �HR-DOMESTIC HOT WATER RETURN S STORM CO2 -CARBON DIOXIDE OWNER INSTALLED a <br /> SSW-COLD SOFT WATER -OD-OVERFLOW DRAM Rpgp CONN -CONNECTION;CONNECT <br /> �Ni-HEAT TRACE HOT WATER -FM-FORCE MAIN REDUCED PRESSURE PRESSURE GAUGE CONTR -CONTRACTOR P -PUMP <br /> OR (WITH GAUGE VALVE) OR -CORRIDOR PC -PLUMBING CONTRACTOR w <br /> �1PW-NON-POTABLE WATER --CWW-CLEARWATER WASTE BCLOW PREVENTER <br /> � AKF CS -CLINICAL SINK! PH -PHASE <br /> -D�DEIONIZEO WATER -IW-INDIRECT WASTE WATER METER COLD SOFT WATER/CUP SINK PIV -POST INDICATOR VALVE O <br /> - <br /> -RO-REVERSE OSMOSIS WATER -GW-GREASE WASTE CTR CENTER PLBG PLUMBING 0CU COPPER PRESS -PRESSURE w <br /> -PW-PURE WATER -CRW-CORROSION RESISTANT ���DOUBLE CHECK BACKFLOW �WATER HAMMER CRVTR -CORROSIVE VENT PRV -PRESSURE REDUCING VALVE PROPOSED SCOPE OF WORK <br /> �CW-PROCESS COLD WATER PREVENTER ARRESTOR THROUGH ROOF PSF -POUNDS PER SQUARE FOOT <br /> ---PHW-PROCESS HOT WATER - - - -UNDERFLOOR WASTE OR W CW -CLEARWATER WASTE PSI -POUNDS PER SQUARE NCH Addition of above ground grease interceptor to service 3 compartment sink& <br /> -PHR-PROCESS HOT WATER RETURN SOIL,SUBSOIL,STORM& PRESSURE OR VACUUM PSIG -POUNDS PER SQUARE NCH meat prep sink.Connection to existing santiary services. <br /> FORCE MAIN ZVS SWITCH D -DEPTH/DRAIN LINE GAUGE <br /> -LCW-LAB COLD WATER ZONE VALVE BOX <br /> SHOWN <br /> HEAT TRACE TERMINATION DCW -DOMESTIC COLD WATER PW -PURE WATER <br /> -LHW-LAB HOT WATER LABEL IS SHOWN ON FRONT POINT DIET -DETAIL VENT OF VALVE BOX TO INDICATE <br /> �HR-LAB HOT WATER RETURN DFU -DRAINAGE FIXTURE UNIT R RADIUS <br /> ORIENTATION HEAT TRACE POWER <br /> -TF-TRAP FILLER LINE --.V•--VENT �CONNECTION POINT DER -DOMESTIC HOT WATER RETURN PAD -REFRIGERATED AIR DRYER <br /> -TW-TEMPEREDWATER --CWV--CLEARWATER VENT AAP OR MAP DEW -DOMESTIC HOT WATER RD -ROOF DRAIN <br /> i HOSE BOB DIA -DIAMETER REC -RECESSED <br /> GASES -�.RV--CORROSION RESISTANT VENT AREA OR MASTER ALARM DM -DIMENSION RECPT -RECEPTACLE <br /> PANEL LABEL ISSHOWN ON DAL -DISCHARGE REF -REFERENCE APPLICABLE CODES GENERAL NOTES <br /> WALL HYDRANT <br /> -AR-ARGON FRONT E PANEL TO DN -DOWN+DOWNSPOUT NOZZLE R -REQUIRED 2021 Uniform Plumbing Code(UPC)with Washington State Amendments <br /> INDICATE ORIENTATION DS -DOWNSPOUT RI ROUGH-IN _iE <br /> - REVOLUTIONS <br /> CA-COMPRESSED AIR $ SLIDE-OXYGEN OR DW -DISHWASHER RPM -REEVOLUTIONS PER MINUTE 2021 Washington State Engery Code(WSEC) 1. The Following Notes Apply to All Plumbing Drawing.Additional Plumbing Note Maybe Indicated on Each Plumbing Drawing.See <br /> ---0O2-CARBON DIOXIDE VACUUM BOTTLE DWG -DRAWING RV -RELIEF VALVE ICC/ANSI Al 17.1-2017Accessible&Usable Buildings&Facilities Specifications for Additional Requirements. <br /> -H2- HYDROGEN OUTLET <br /> -LA- LABORATORY COMPRESSED AIR EA EACH S STORM <br /> EEW -EMERGENCY EYEWASH SAN -SANITARY 2. All Work Done From These Documents Shall Conform to all Applicable Codes and Ordinances. <br /> -LN2- LIQUID NITROGEN w FLOW SENSING DEVICE EFF -EFFICIENCY SCH -SCHEDULE <br /> -LVAC- LABORATORY VACUUM EJ -EXPANSION JOINT SCFM -STANDARD CUBIC FEET 3. Install All Waste Line Cleanouts In Accordance with Chapter Seven of the UPC. <br /> -MA- MEDICAL COMPRESSED AIR ELEC ELECTRICAL PER MINUTE A. 3"Waste Pipe-3"Cleanout with 2.5"Plug <br /> -MV- MEDICAL VACUUM ELEV -ELEVATION SO -SUBSOIL DRAIN <br /> -NG- NATURAL GAS EQUIP -EQUIPMENT SF -SQUARE FEET B. 4"Waste Pipe 4"Cleanout with 3.5"Plug <br /> DRAINS AND CLEANOUTS ET EXPANSION TANK SH SHOWER C. 6"Waste Pipe-4"Cleanoutwith 3.5"Plug <br /> -N-2 NITROGEN ETA -EXISTING TO REMAIN BHT -SHEET <br /> ---J20- NITROUS OXIDE ES -EMERGENCY SHOWER SPEC -SPECIFICATION 4. All Sanitary Sewer Piping Below Slab Shall be Installed at a Minimum of 1/4"Per FT Slope Unless Approval is Provided b the <br /> �2-OXYGEN i� FLOOR DRAIN,FLOOR SINK FIXTURE WASTE TRAP EWC -ELECTRIC WATER COOLER SO -SQUARE ry P 9 P pp Y <br /> -WAoo-WASTE ANESTHETIC GAS DISPOSAL o-� EWT -ENTERING WATER SR -SERVICE RECEPTOR ESeeed Iine note for 3 compartment sink on "Administrative Authority"in Writing for A Shallower Slope.In No Case Shall SewerPiping be Installed at LessThan 1/8"PerFT <br /> -WGE-WASTE GAS EVACUATION ® ROOF DRAIN o-1' CLEANIOUT TEMPERATURE ST STAINLESS STEEL Slope.In No Case Will Piping Smaller Than 4"be Installed at Slopes Shallower Than 1/4"Per FT.Piping Installed at 1/8"Per FT <br /> ENT -EXPANSION STD STANDARD <br /> FCO ENT -EXTERIOR SIS -STRUCTURAL/STRUCTURE Shall be tops d Per All Plumbing <br /> 7 of the UPC and Supporting Calculation Submitted for Review. <br /> O HUB DRAIN O FLOOR CLEANOUT SUCT -SUCTION <br /> •F -FLOOR CLEANOUT EIT 5. Provide Stops Prior to All Plumbing Equipment.Provide Waste Traps at all Direct Connected Equipment in Accordance with Code <br /> FDO -FLOOR DRAT TO -TRENCH DRAIN <br /> PIPING SYMBOLS FD FLOOR DRAIN DH TOTAL EMPERATURDYNAMIC HEAD and the specifications. <br /> FLA •FULL LOAD AMPERES TEMP -TEMPERATURE <br /> FLR -FLOOR TMV THERMOSTATIC MIXING VALVE 6. Provide Trap Primers at All Floor Drains Unless Noted Otherwise.Provide Union on Upstream and Downstream Side of All Trap <br /> FM FORCE MAIN TOB -TOP OF BEAM <br /> SINGLE DOUBLE FP -FIREPROOF TOD -TOP OF DECK Primer.Trap Primer Branch Takeoff Shall be From Top of Main Distribution Pipe. <br /> a ELBOW DOWN FPM -FEET PER MINUTE TOJ -TOP OF JOIST <br /> FS -FLOOR SINK TOS -TOP OF SLAB I TOP OF STEEL 7. Insulate P-Traps Exposed in Unheated Spaces. <br /> FSEC -FOOD SERVICE EQUIPMENT TF -TRAP FILLER <br /> --------0 ® ELBOW UP CONTRACTOR TP -TRAP PRIMER SUBJECT TO FIELD 8. See Architectural Drawings for Plumbing Fixture Rough-in Dimensions Other Details.Also See Architectural Drawings for Finish <br /> FT -FEET TYP -TYPICAL 9 99 <br /> FTHD FEET HEAD Requirements of All Plumbing Fixtures Including Requirements for Flush Lever Locations at ADA Compliant Toilets and Valve <br /> 1 BOTTOM CONNECTION FTG FOOTING UR URINAL INSPECTION Locations of ADA Showers. O <br /> (45.OR 90-) <br /> G -GAS V -VENi+VOLTS <br /> GA -GAUGE VAC -VACUUM 9. Refer to Architectural and Structural Drawings for General Construction including Concrete Equipment Pads,Flashing Details,ECT. <br /> TOP CONNECTION GAL -GALLON VEL -VELOCITY <br /> �IJ~ (45-OR W) GALV -GALVANIZED VFD -VARIABLE FREQUENCY DRIVE 10.Refer to Architectural Drawings for Room Elevations.Locate Plumbing Fixture Heights Shown on Architectural Room Elevations. <br /> GC -GENERAL CONTRACTOR VOL -VOLUME 'A <br /> +^ GPH GALLONS PER HOUR VTR VENT THRU ROOF V/) <br /> 45"PIPE RISE(R)+DROP(D) GPM -GALLONS PER MINUTE 11.Plumbing Drawings Show Approximate Locations of Plumbing Fixtures.Refer to Architectural Plans for Exact Locations.Coordinate <br /> W -WASTE/WATER Floor Drains for Mechanical Spaces With Mechanical Equipment Being Served. <br /> TEE(REFER TO HB -HOSEBISB W/ -WITH O <br /> SPECIFICATION FOR SIDE. HO -HUSDRAIN WA -WITHOUT <br /> TOP OR BOTTOM TEE) HP -HORSEPOWER WAGD -WASTE ANESTHETIC 12.Refer to Electrical Drawings for Additional Electrical Requirements of Plumbing Equipment(Voltage/ECT.) <br /> HR -HOSE REEL GAS DISPOSALHIT HEAT TR ' ` � <br /> j o EXISTING PIPING TO REMAIN HIM HEATER ACE HOT WATER WC WATER CLOSET WEI WALL BOX 13.Secure Water Heaters,Storage Tanks,and Plumbing Equipment to Structure as Required by Code. V w <br /> HVAC HEATING,VENTILATING, WCO -WALL CLEANOUT <br /> LINE CONTINUATION BREAK 8 AIR CONDITIONING WGE -WASTE GAS EXHAUST 14.Access Panels are Required at All Concealed Valves and Equipment.Coordinate Locations and Size with Architect. <br /> HZ -HERTZ WH -WALL HYDRANT Q CY) <br /> WHA -WATER HAMMER ARRESTOR <br /> Q FLOW DIRECTION ID -INSIDE DIAMETER WHIR -WATER HEATER 15.Coordinate Locations of Plumbing Equipment to Provide Clearances Over Lighting Fixtures for Removal and Service Access Due to Q <br /> IE -INVERT ELEVATION WSFU -WATER SUPPLY FIXTURE UNIT m <br /> M -ICE MAKER Equipment Maintenance. J <br /> WA CONNECTION POINT IN •INCHES X EXISTING 0 <br /> IN WC -INCHES WATER COLUMN 16.Do Not Core Drill Or Drill Through Beams,Columns,and Shear Walls.Unless indicated on Structural Drawings or as Approved by <br /> M! -INDIRECT WASTE YCO -YARD CLEANOUT Structural Engineer. <br /> OR ECCENTRIC REDUCER CV LU <br /> JS -JANITORS SINK 2V8 -ZONE VALVE BOX <br /> 17.Pipes Indicated Without Dimensions Shall be Sized Per Preceding Upstream Pipe Section. 0 M Of <br /> KW -KILOWATT CV W <br /> CONCENTRIC REDUCER 18.Drawings are Schematic in Some Areas and May not Show Piping Offsets Which May be Required. C\1 <br /> 19.Coordinate Demolition Work With Architectural Demolition Drawings. LJJ <br /> PROJECT LOCATION 20.All Piping Subject to Freezing Shall be Protected From Freezing Per the Requirements of the UPC 312.6 MJ <br /> 21.Plumbing Vents Shall Terminate Minimum of 10'From Fresh Air Intake Per Code. W <br /> 22.Label All Piping Systems Per the IMC and UPC. J/ <br /> AA 23.Support and Brace Piping Systems in Accordance with the UPC. AG'' <br /> Imo^3 24.All Material in Contact with Piping Systems Shall Be Compatible for Use with and For Contact with the Piping Material.Contractors ' r` <br /> r` and Trades Shall Verify Compatibility of Their Products with the Piping Systems.This Includes,But is Not Limited to,Fire Stopping I••� <br /> t Sealants,Fire Stopping Collars,Vibration Isolation Elements,Thermal Insulation,Expansion Joints,and Any Material in Contact <br /> with Pipes. <br /> 25.All Items in Contact with Potable Water Shall Comply with the National"Reduction of Lead Drinking Water Act"S.3874 <br /> O ' 26.Where Manufactures Have Recommended or Required Training Programs for the Installation of Their Products,Then All Contractor <br /> • Employees Installing That Product Shall be Trained and Have Written Documentation Confirming that Training,and Shall Finnish a <br /> Copy of the Training Documentation Within the Project Submittal for Each Installing Individual Showing Current Installation <br /> j r Training. <br /> t F <br /> 27.The Contractor Shall be Responsible for the Coordination of his Trade Taking Part in Performing the Work Specified by These <br /> r. T T Y:94F �`Ir L5- Documents. <br /> S f 28.All Conditions and Dimensions Shall be Verified by the Contractor of Site.Any Variance Between These Documents and the Actual <br /> a Conditions and Any Errors Shall be Resolved by Contractor Before Proceeding with Work. li F- <br /> - 29.Do Not Scale Drawings. Z O <br /> 30.Substitutions Shall be Approved by Owners representative Before Proceeding. w w <br /> O O <br /> e' 31.Do Not Allow Debris to Accumulate of Site.Dispose of Property as Soon as Possible. a a <br /> 32.Take Every Precaution to Safeguard Persons and Property. <br /> 33.Repair All and Any Damages Caused in the Execution of These Documents. <br /> DATE: 03/01/2025 <br /> as 34.Install All Material and Equipment According to Manufactures's Specifications.Provide Warranty and Instructions to Owner. SCALE: <br /> j 35.All Piping Shall be Insulated as Required by the 2021 UPC&Washington State Energy Codes.Minimum Insulation Shall be 112" <br /> Thickness on Domestic Cold Water,1"Thickness insulation on Hot and Hot Water Recirculation Systems. SHEET SIZE: 36"x 48" <br /> 5-� __ - - DRAWN BY: CHRIS CLEMENS <br /> r r CLEMECD986N1 <br /> r J r; <br /> CHECKED BY: INSPECTOR <br /> t <br /> JOB N0. <br /> Eve! <br /> PERMIT <br /> DRAWINGS <br /> I e. SHEET NAME: <br /> PROJECT <br /> 6 INFORMATION <br /> ' ® AREA#: REV. <br /> VICINITY MAP LOCATION MAP a <br /> PROJ.#: <br /> NORTH NORTH DRAWING NO. <br /> P-1.0 <br />