Laserfiche WebLink
17. This property is located in the Airport Compatibility Area.A disclosure notice will be required to <br /> be recorded on title prior to building permit issuance. <br /> 18. Refer to the Planning Director's Decision under REVIl18-021 for conditions related to critical <br /> area features and the stream relocation project. <br /> 19. A final inspection will be required by the Planning Department prior to Certificate of <br /> Occupancy and final project approval. <br /> 20. The above comments are preliminary and may change or be modified atthe time of <br /> construction permit review based on the proposed design. <br /> Public Works/Engineering Comments—Sabrina Fandler 425.257.7813 <br /> 1. Construction permits,inspections and final approvals are required for this project from City of Everett <br /> Permit.Services. <br /> 2, A Demolition Permit will be required to be obtained from the Permit Counter prior to any demolition work. <br /> All existing water services will need to be disconnected at the meter prior to demolition. For all existing <br /> side sewers serving the property,a Utility Permit for Side Sewer Cap-Off must first be obtained from the <br /> Permit Services Counter prior to demolition of the building.Side sewers shall be capped at the property line <br /> of the subject property. <br /> 3. A Public Works Permit is required for this project. Detailed drawings in accordance with the current City of <br /> Everett Design and Construction Standards and Specifications for Development shall be submitted to the <br /> Public Works Department,showing site grading,paving, landscaping, utilities,storm drainage,temporary <br /> construction erosion and sedimentation control (TESC),and all required improvements in the public right- <br /> of-way. Public Works Department approval of these drawings is required prior to any permits being issued. <br /> All improvements shall be completed,approved,and warranted before the Occupancy Permit is <br /> issued/final approval is granted. <br /> 4_ The construction plans must be designed from a site survey performed by a licensed State of Washington <br /> land surveyor. <br /> 5. Temporary erosion and sedimentation control (TESL) measures for construction activity must be <br /> operational prior to commencement of any clearing or earthwork.An approved permit and SWPPP for this <br /> work is required prior to set-up of TESC measures on-site.All BMPs must comply with City of Everett Design <br /> and Construction Standards and Specifications for Development. <br /> 6. All exposed ground must be reseeded within 30 days of the completion of construction.If reseeding is not <br /> practical due to weather or seasonal restraints,the ground must be covered with mulch as directed by the <br /> City Engineer. <br /> Page 6 of 13 <br /> Project No.SEPA18-021 <br /> EVERETT <br />