My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />Port Gardner Storage Facility - Facility Construction Package Table of Contents <br />Project No. 157889 3 <br /> <br />DIVISION 05 METALS Engineer of <br />Record <br />05 05 14 HOT-DIP GALVANIZING G. Mazzotti <br />05 05 20 ANCHOR BOLTS G. Mazzotti <br />05 10 00 STRUCTURAL METAL FRAMING G. Mazzotti <br />05 31 23 STEEL ROOF DECKING G. Mazzotti <br />05 40 00 COLD FORMED METAL FRAMING G. Mazzotti <br />05 50 00 METAL FABRICATIONS G. Mazzotti <br />05 51 00 METAL STAIRS G. Mazzotti <br />05 52 10 ALUMINUM RAILINGS G. Mazzotti <br />05 52 20 STEEL RAILINGS G. Mazzotti <br />05 53 10 METAL GRATINGS AND STAIR TREADS G. Mazzotti <br /> <br />DIVISION 06 WOOD, PLASTICS, AND COMPOSITES Engineer of <br />Record <br />06 16 00 SHEATHING A. Armstrong <br />06 41 16 PLASTIC-LAMINATE-FACED CABINETS A. Armstrong <br />06 64 00 PLASTIC PANELING A. Armstrong <br />06 71 10 FIBERGLASS REINFORCED PRODUCTS AND FABRICATIONS G. Mazzotti <br />06 74 13 FIBERGLASS REINFORCED GRATINGS G. Mazzotti <br /> <br />DIVISION 07 THERMAL AND MOISTURE PROTECTION Engineer of <br />Record <br />07 10 00 WATERPROOFING A. Armstrong <br />07 21 00 THERMAL INSULATION A. Armstrong <br />07 27 15 NONBITUMINOUS SELF-ADHERING SHEET AIR BARRIERS A. Armstrong <br />07 41 13.13 PREFORMED METAL ROOF PANELS A. Armstrong <br />07 41 13.16 STANDING-SEAM METAL ROOF PANELS A. Armstrong <br />07 42 00 INSULATED METAL WALL PANELS A. Armstrong <br />07 42 13 FORMED METAL WALL PANELS A. Armstrong <br />07 54 19 POLYVINYL-CHLORIDE (PVC-KEE) ROOFING A. Armstrong <br />07 62 00 SHEET METAL FLASHING AND TRIM A. Armstrong <br />07 72 53 SNOW GUARDS A. Armstrong <br />07 72 93 METAL SOFFIT PANELS A. Armstrong <br />07 91 26 JOINT FILLERS G. Mazzotti <br />07 92 00 JOINT SEALANTS A. Armstrong <br /> <br />DIVISION 08 OPENINGS Engineer of <br />Record <br />08 11 13 HOLLOW METAL DOORS AND FRAMES A. Armstrong <br />08 31 13 ACCESS DOORS AND FRAMES A. Armstrong <br />08 31 20 FLOOR ACCESS DOORS G. Mazzotti <br />08 33 00 OVERHEAD COILING DOORS A. Armstrong <br />08 36 13 SECTIONAL OVERHEAD DOORS A. Armstrong <br />08 51 13 ALUMINUM WINDOWS A. Armstrong <br />08 71 00 DOOR HARDWARE A. Armstrong <br />08 80 00 GLAZING A. Armstrong <br />08 91 19 FIXED LOUVERS A. Armstrong
The URL can be used to link to this page
Your browser does not support the video tag.