Laserfiche WebLink
<br />Port Gardner Storage Facility - Facility Construction Package Table of Contents <br />Project No. 157889 4 <br /> <br />DIVISION 09 FINISHES Engineer of <br />Record <br />09 22 16 NON-STRUCTURAL METAL FRAMING A. Armstrong <br />09 24 00 CEMENT PLASTERING A. Armstrong <br />09 29 00 GYPSUM BOARD A. Armstrong <br />09 30 13 CERAMIC TILING A. Armstrong <br />09 51 13 ACOUSTICAL PANEL CEILINGS A. Armstrong <br />09 65 13 RESILIENT BASE AND ACCESSORIES A. Armstrong <br />09 65 19 RESILIENT TILE FLOORING A. Armstrong <br />09 67 23 RESINOUS FLOORING A. Armstrong <br />09 90 00 PAINTING AND COATING R. Long <br />09 91 23 INTERIOR PAINTING A. Armstrong <br />09 96 00 HIGH PERFORMANCE PROTECTIVE COATINGS FOR WASTEWATER R. Long <br /> <br />DIVISION 10 SPECIALTIES Engineer of <br />Record <br />10 14 23.16 ROOM-IDENTIFICATION PANEL SIGNAGE A. Armstrong <br />10 28 00 TOILET, BATH AND LAUNDRY ACCESSORIES A. Armstrong <br />10 44 16 FIRE EXTINGUISHERS A. Armstrong <br />10 51 13 LOCKERS AND BENCHES A. Armstrong <br />10 81 13 BIRD CONTROL DEVICES A. Armstrong <br /> <br />DIVISION 11 EQUIPMENT Engineer of <br />Record <br />11 30 13 RESIDENTIAL APPLIANCES A. Armstrong <br /> <br />DIVISION 12 FURNISHINGS Engineer of <br />Record <br />12 36 61.16 SOLID SURFACING COUNTERTOPS A. Armstrong <br />12 48 13 ENTRANCE FLOOR MATS AND FRAMES A. Armstrong <br /> <br />DIVISION 22 PLUMBING Engineer of <br />Record <br />22 00 00 PLUMBING BASIC REQUIREMENTS C. Biesemeyer <br />22 05 00 VALVES AND ACCESSORIES FOR PLUMBING PIPING C. Biesemeyer <br />22 10 00 PLUMBING PIPING C. Biesemeyer <br />22 10 01 PIPING SYSTEM SCHEDULES C. Biesemeyer <br />22 13 19 SANITARY WASTE PIPING SPECIALTIES M. Bray <br />22 14 29.16 SUBMERSIBLE SUMP PUMPS M. Bray <br />22 30 00 PLUMBING EQUIPMENT C. Biesemeyer <br />22 40 00 PLUMBING FIXTURES C. Biesemeyer <br /> <br />DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) Engineer of <br />Record <br />23 00 00 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) BASIC <br />REQUIREMENTS <br />C. Biesemeyer <br />23 05 00 VALVES AND ACCESSORIES FOR HVAC PIPING AND DUCTWORK C. Biesemeyer <br />23 05 93 TESTING, ADJUSTING AND BALANCING FOR HVAC C. Biesemeyer <br />23 07 00 HVAC INSULATION C. Biesemeyer