My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 25 - 1 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 63 25 - 1 SUBSTITUTION REQUEST FORM <br />SECTION 00 63 25 - SUBSTITUTION REQUEST FORM <br />PROJECT: Port Gardner Storage Facility – Facility Construction Package <br />REQUEST NO.: <br />CONTRACTOR: DATE: <br />We hereby submit for consideration, following product instead of specified item for <br />above project: <br />Section Specified Item <br />Proposed Substitution <br />Attach complete technical data, including laboratory tests, and samples, as applicable. <br />Attach detailed comparison of the significant qualities (size, weight, durability, <br />performance and similar characteristics, and including visual effect where applicable) for <br />the proposed substitution in comparison with the original requirements. <br />List complete installation changes and changes to Drawings and Specifications required <br />by proposal. <br />Fill in Blanks Below: <br />A. Does substitution require change in Drawing dimensions? <br />B. Will Undersigned pay for resulting building design changes including engineering <br />and detailing costs? <br />C. What effect does substitution have on other trades? <br />D. Differences between proposed substitution and specified item? <br />E. Manufacturer's guarantees of proposed and specified items are: <br /> Same _____ Different (Explain on attachment) <br />F. Name and address of three (3) similar projects on which product was used, and <br />date of installation <br />G. Contract completion date is: _____Same ______Different (Explain on attachment).
The URL can be used to link to this page
Your browser does not support the video tag.