My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 63 25 - 2 <br />Port Gardner Storage Facility - Facility Construction Package WO# UP-3525 <br />00 63 25 - 2 SUBSTITUTION REQUEST FORM <br />H. Cost Savings? <br />Undersigned attests function and quality equivalent or superior to specified item and waives his <br />rights to additional payment and time which may subsequently be necessitated, by failure of the <br />substitution to perform adequately, and for the required work to make corrections thereof. <br />Signature must be by a person having authority to legally bind his firm to the above terms. <br />Failure to provide legally-binding signature will result in approval retraction. <br />Submitted by: <br />______________________________ <br />Signature Date <br />__________________________________________ <br />Printed <br />______________________________________________________________________ <br />Firm <br />______________________________________________________________________ <br />Address <br />______________________________________________________________________ <br />Telephone <br />For use by Architect/Engineer: <br />____Accepted ____Accepted as Noted ____Not Accepted ____Received Too Late <br />BY: Date: <br />Remarks: <br />For use by Owner: <br />____Accepted ____Accepted as Noted ____Not Accepted ____Received Too Late <br />______________________________________________________________________ <br />Project Manager Date <br />Remarks: <br />______________________________________________________________________ <br />END OF SECTION 00 63 25
The URL can be used to link to this page
Your browser does not support the video tag.