My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 4 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 4 GENERAL CONDITIONS <br />Owner: The City of Everett, Washington. "Owner" and the "City" mean the same. <br />Owner Controlled Float: An activity or activities that the Contractor shall enter into its Schedule in a <br />specified location(s) with a specified duration(s) that is under the sole control of the Owner. <br />Owner's Representative: The person designated in writing and employed or retained by the Owner to <br />act as its representative at the construction Site and to perform construction inspection service and <br />administrative functions relating to this Contract. The terms “Owner’s Representative”, “Engineer” and <br />“Architect” are interchangeable. <br />Person: Includes individuals, associations, firms, companies, corporations, partnerships, and joint <br />ventures. <br />Physical Completion: Physical Completion Date is the day all of the Work is physically completed on <br />the Project. All documentation required by the Contract and required by law does not necessarily need to <br />be furnished by the Contractor by this date. <br />Progress Schedule: A schedule prepared and maintained by Contractor, describing the sequence and <br />duration of the activities comprising the Contractor’s plan to accomplish the Work within the Contract <br />Time. <br />Project: The undertaking to be performed under the provisions of the Contract. <br />Punch List: List of incomplete items of Work and of items of Work that are not in conformance with the <br />Contract Documents, prepared after Substantial Completion. <br />Reference Information: Information provided to the Contractor by the City that is not part of the <br />Contract. <br />RCW: Means the Revised Code of Washington. <br />Samples: Physical examples of materials, Equipment, or workmanship that are representative of some <br />portion of the Work and which establish the standards by which such portion of the Work will be judged. <br />Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. Schedule of <br />Values. <br />Shall: Required conduct. <br />Shop Drawings: All drawings, diagrams, illustrations, schedules, and other data or information, which <br />are specifically prepared or assembled by or for Contractor and submitted by Contractor, to illustrate <br />some portion of the Work. <br />Shown: Refers to information presented on the Drawings, with or without reference to the Drawings. <br />Site: Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the <br />Work is to be performed, including rights-of-way and easements for access thereto, and such other lands <br />furnished by Owner that are designated for the use of Contractor. <br />Specifications: That part of the Contract Documents consisting of written descriptions of the technical <br />features of materials, Equipment, construction systems, standards, and workmanship. <br />Specify: Refers to information described, shown, noted or presented in any manner in any part of the <br />Contract Documents. <br />Subcontractor: An individual or entity having a direct contract with Contractor or with any other <br />Subcontractor for the performance of a part of the Work. <br />Submittals: The information required by the Contract Documents provided by Contractor to the <br />Owner’s Representative or Owner.
The URL can be used to link to this page
Your browser does not support the video tag.