My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Absher/Stellar J Joint Venture 12/8/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Absher/Stellar J Joint Venture 12/8/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2025 10:47:19 AM
Creation date
12/9/2025 8:30:57 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Absher/Stellar J Joint Venture
Approval Date
12/8/2025
Council Approval Date
11/19/2025
Department
Public Works
Department Project Manager
Zach Brown
Subject / Project Title
Port Gardner Storage Facility – Facility Construction Package Vol 1-5
Tracking Number
0005035
Total Compensation
$104,860,670.13
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2805
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
City of Everett 00 72 00 - 5 <br />Port Gardner Storage Facility – Facility Construction Package WO# UP-3525 <br /> <br /> <br />00 72 00 - 5 GENERAL CONDITIONS <br />Substantial Completion: The day on which the Owner or Owner’s Representative determines the <br />Owner has full and unrestricted use and benefit of the Project, from both the operational and safety <br />standpoints and only minor incidental Work, replacement of temporary substitute facilities, or minor <br />correction or repair Work remains. Determination of Substantial Completion in whole or in part is solely <br />at the discretion of the Owner. Substantial Completion does not mean complete in accordance with the <br />Contract nor shall Substantial Completion of all or any part of the Project entitle the Contractor to Final <br />Acceptance under the Contract. <br />Supplier: A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct <br />contract with Contractor or with any Subcontractor to furnish materials or Equipment to be incorporated <br />in the Work. <br />Total Float: The amount of time any given activity or path of activities may be delayed before it will <br />affect the Completion Date. <br />Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and <br />equestrian traffic. <br />Unabsorbed Overhead: The reduction or loss of contribution to recovery of the Contractor’s Overhead <br />costs realized by the result of reduced Project or Contractor billings, or both, due to any reason <br />whatsoever, including a Project extension. <br />Unit Price Work: Refers to items of Work identified by unit prices in the Bid form. <br />Work: Refers to the Project and the provision of all labor, materials, Equipment, supplies, services, and <br />other items necessary for the execution, completion and fulfillment of the Contract. <br />1.2. CONTRACT DOCUMENTS <br />The complete Contract includes the following, which are Contract Documents: <br />1. Federal and state requirements that apply to this Contract and Project; <br />2. Supplemental agreements between Owner and Contractor, if any, subsequent to the Owner’s <br />execution of the Contract and signed by the Mayor of the City of Everett for Owner and by an <br />authorized representative of Contractor <br />3. Change Orders; <br />4. Addenda; <br />5. The Contract; <br />6. Bid Form; <br />7. Specifications, including, but not limited to, these General Conditions and other numbered <br />Documents and Sections; <br />8. Supplementary Conditions, if any; <br />9. Drawings and plans; <br />10. City of Everett standard plans in effect as of the date Bids are opened; <br />11. Notice to Bidders/Instructions to Bidders; and <br />12. Certifications and affidavits as required by this Contract and by law. <br />Any inconsistency in the parts of the Contract shall be resolved by following this order of precedence in <br />the list above (e.g., 1 presiding over 2, 3, 4, 5, and 6; 2 presiding over 3, 4, 5, and 6; and so forth). This <br />order of precedence shall not apply when Work is required by one part of the Contract but omitted from <br />another part or parts of the Contract. The Work required in one part must be furnished even if not <br />mentioned in other parts of the Contract.
The URL can be used to link to this page
Your browser does not support the video tag.